Task Estimation
Use this skill when the job is to turn messy scope into one estimate packet with the right horizon, honest uncertainty, and one next move.
task-estimation owns:
- relative sizing before commitment
- choosing the lightest credible estimate unit
- confidence / uncertainty language
- split-or-spike decisions
- short forecast-safe translation notes
- cross-functional burden visibility for launch or game work
Read these support docs before unusual cases or when the request starts to sprawl:
- references/estimation-modes.md
- references/intake-packets-and-route-outs.md
- references/boundary-guide.md
When to use this skill
- A user asks “how big is this?”, “how risky is this?”, or “how should we estimate this?”
- A team needs story points, t-shirt sizing, planning-poker preparation, or confidence framing before a sprint or milestone discussion.
- A roadmap item, bug cluster, launch task, or game milestone needs an estimate without pretending it is already schedule-safe.
- Work is mixed enough that the first useful output is an estimate packet plus split/spike guidance.
- The estimate must surface dependencies, approvals, QA, release, content, or live-ops burden rather than only code effort.
When not to use this skill
- The main job is decomposition into execution-ready slices →
task-planning. - The main job is daily status, blockers, or team synchronization →
standup-meeting. - The main job is reviewing how the process went after delivery →
sprint-retrospective. - The user wants a hard ship date, fixed commitment, or executive promise with no uncertainty language.
- The only honest estimate is discovery itself. In that case, estimate the spike/prototype/vertical-slice work, not the fantasy final implementation.
Instructions
Step 1: Classify one primary estimation mode
Normalize the request before assigning any numbers.
estimation_intake:
primary_mode: coarse-triage | sprint-candidate | forecast-support | discovery-spike | milestone-cross-functional
domain: developer-workflow | web-fullstack | product-ops | marketing-gtm | game-development | mixed
source_material: issue-spec | roadmap-note | launch-packet | gdd-playtest | bug-cluster | chat-context | unknown
novelty: low | medium | high
confidence: high | medium | low
output_shape: estimate-packet | comparison-table | spike-brief | unknown
Use one primary mode per run:
coarse-triage— rough sizing for intake, backlog cleanup, or roadmap comparisonsprint-candidate— relative sizing for near-term workforecast-support— range-and-assumptions help for scope/date conversationsdiscovery-spike— estimate investigation/prototype work, not final deliverymilestone-cross-functional— work where engineering is only part of the burden
Do not blend several primary modes into one answer.
Step 2: Gather the smallest credible evidence packet
Pull only the evidence needed to support an honest estimate:
- item summary and intended outcome
- current artifacts: issue, PRD, spec, note dump, playtest notes, bug list, launch notes
- systems touched: frontend, backend, data, infra, QA, analytics, content, store/release, live ops
- dependencies, approvals, or external constraints
- known unknowns that could swing the estimate
If evidence is thin, lower confidence immediately or switch to discovery-spike.
Step 3: Choose the lightest estimate unit
Use references/intake-packets-and-route-outs.md.
Default selection:
- T-shirt / coarse bucket for intake and roadmap comparison
- Story points / relative scale for sprint-candidate discussion
- Range + assumptions for forecast-support packets
- Spike estimate when uncertainty dominates
Rules:
- Keep relative sizing visible even if someone asks for time.
- Translate to time only after stating assumptions.
- If discovery and delivery are mixed together, estimate them separately.
Step 4: Calibrate against anchors and burden
Do not estimate in a vacuum.
Compare against 2-3 anchors when possible:
- one small familiar item
- one medium normal item
- one large item that usually needs splitting
Check burden explicitly:
- complexity and novelty
- unknowns and dependency count
- testing / QA / validation load
- rollout, migration, approval, or coordination work
- content, localization, certification, or live-ops burden for GTM/game cases
If no anchors exist, say so and increase caution rather than pretending confidence.
Step 5: Produce one estimate packet
Every answer should include:
- estimate mode
- estimate unit and value
- confidence
- why this size
- uncertainty drivers
- dependencies / approvals
- split-or-spike recommendation
- forecast note: how this should and should not be used
- adjacent handoff when the next job changed
Use one compact packet, not a long agile tutorial.
Step 6: Trigger split-or-spike decisions early
Recommend a split when:
- the estimate reaches
13,XL, or similar “too big” territory - discovery and implementation are bundled together
- more than one owner/system/approval path is hidden in one item
- validation, migration, or launch burden is non-trivial
Recommend a spike when:
- key unknowns dominate the estimate
- external APIs, vendors, or platform behavior are unclear
- product/game direction is still being validated
- the estimate would otherwise be fake precision
Step 7: Route adjacent work explicitly
Before finalizing, state what comes next:
- use
task-planningfor slice design, acceptance criteria, owners, and execution packets - use
standup-meetingwhen the next need is daily coordination on already-chosen work - use
sprint-retrospectivewhen the next need is learning whether the sizing process worked - do not turn this skill into roadmap commitments, status theater, or board management
Output format
# Estimate Packet
## Mode
- Primary mode:
- Domain:
- Why it fits:
## Evidence used
- Main artifacts:
- Systems / functions touched:
- Assumptions / gaps:
## Recommended estimate
- Unit:
- Estimate:
- Confidence:
- Comparable anchors:
## Why this size
- ...
- ...
## Uncertainty drivers
- ...
## Dependencies / approvals
- ...
## Split or spike recommendation
- Keep as-is | Split | Estimate the spike first
- Reason:
## Forecast note
- Safe use:
- Unsafe use:
## Adjacent handoff
- Next skill / process:
Examples
Example 1: Sprint-candidate SaaS feature
Input
Estimate adding Slack OAuth login plus account linking for the next sprint. We already have user accounts and one OAuth provider in production.
Good output direction
- mode:
sprint-candidate - unit: story points
- estimate: moderate relative slice with medium confidence
- include auth-flow and verification burden
- route final decomposition to
task-planning
Example 2: Product/ops roadmap item with high ambiguity
Input
How big is a full creator analytics dashboard for Q3? Metrics, data sources, and stakeholder definitions are still fuzzy.
Good output direction
- mode:
coarse-triageordiscovery-spike - unit: t-shirt size or spike brief
- confidence: low
- explicitly say the estimate is not ready for a hard date conversation
Example 3: Game milestone packet
Input
Estimate adding a tutorial checkpoint system before the public demo build. It touches save state, UI messaging, QA regression, and demo flow polish.
Good output direction
- mode:
milestone-cross-functional - include non-code burden like QA/polish and release readiness
- recommend split or spike if checkpoint rules are still undefined
Best practices
- Estimate the current decision horizon, not the entire dream scope.
- Keep relative sizing separate from hard commitments.
- Use anchors and comparable work when available.
- Separate discovery from delivery early.
- Surface non-code burden instead of hiding it in one engineering number.
- Prefer one compact estimate packet over a lecture on agile theory.
- If the estimate is weak, say it is weak.