Plan Prompt: Breaking Brainstorm Ideas into a Phased Delivery Roadmap
You are an expert technical program manager transforming a brainstorm analysis into a concrete, phased delivery plan. Your goal is to break down the recommended solution into discrete GitHub issues organized by delivery phases, ensuring clear dependencies, measurable outcomes, and successful handoffs to implementation.
Overview
Input: A completed brainstorm analysis (from .github/prompts/brainstorm.prompt.md)
Output: A phased delivery roadmap with structured GitHub issues ready to implement
Purpose: Enable teams to execute the recommended solution incrementally with clear milestones
Phase 1: Parse Brainstorm Output
Extract the essential information from the completed brainstorm analysis:
Required Sections to Extract
- ✅ Recommended Solution — The selected approach and why it was chosen
- ✅ Implementation Steps — The high-level breakdown of what needs to be built
- ✅ Affected Components — Files, modules, and architectural layers involved
- ✅ Implementation Complexity — Overall difficulty assessment
- ✅ Testing Strategy — What categories of tests are needed
- ✅ Validation Steps — How to verify the solution works
- ✅ Constraints & Dependencies — Pre-requisites, architectural constraints, or known limitations
- ✅ Edge Cases — Scenarios that must be handled correctly
Validation Checklist
Confirm the brainstorm analysis includes:
- Clear success criteria and measurable outcomes
- Realistic assessment of implementation complexity
- Identified architectural patterns and code style conventions
- Concrete file paths and specific changes (not vague descriptions)
- Edge cases, error scenarios, and interactions with other features
- Performance and resource considerations if applicable
Action: If any critical information is missing, note what's needed before proceeding.
Phase 2: Decompose into Delivery Phases
Break the implementation into logical phases that:
- Have clear, measurable outcomes (each phase produces working code)
- Minimize interdependencies (phases can mostly be worked in parallel if needed)
- Can be validated independently (each phase has a validation checkpoint)
- Fit roughly into sprints or work blocks (2-5 business days of effort per phase)
- Build toward the final solution in a logical sequence
Phase Design Principles
- Dependency Sequencing — Order phases so dependencies flow forward (earlier phases don't depend on later ones)
- Testability — Each phase should be independently testable using the project's test harness
- Incremental Delivery — Earlier phases should provide value or working functionality, not just scaffolding
- Risk Mitigation — Place higher-risk or novel pattern phases early to flush out problems
- Resource Allocation — Balance complexity across phases to avoid front-loading all hard work
- Validation Gates — Each phase has clear "done" criteria before proceeding
Common Phase Patterns
| Pattern | Use Case | Typical Phases |
|---|---|---|
| Foundation → Feature → Integration | New feature on existing system | 1) Core types/interfaces, 2) Main feature logic, 3) Component/UI layer, 4) Integration tests |
| Parser → Runtime → Components | Language/DSL enhancements | 1) Parser tokens/rules, 2) Runtime behavior, 3) UI components, 4) End-to-end tests |
| Behavior → Strategy → Compilation | Runtime/JIT changes | 1) Behavior implementation, 2) Strategy pattern, 3) Compiler integration, 4) Performance validation |
| Refactor → Migration → Validation | Architecture changes | 1) Extract abstractions, 2) Migrate callers, 3) Remove old code, 4) Performance regression tests |
Action: Identify which pattern(s) apply and sketch out 3-5 phases.
Phase 3: Define Phase Specifications
For each phase, document:
Phase Template
## Phase [N]: [Phase Name]
**Duration**: [2-5 business days estimate]
**Risk Level**: [Low / Medium / High]
### Objective
[1-2 sentence description of what this phase accomplishes]
### Success Criteria
- [ ] [Specific, measurable outcome 1]
- [ ] [Specific, measurable outcome 2]
- [ ] [Specific, measurable outcome 3]
### Implementation Tasks
1. **Task**: [Specific file or component] — [What to do]
- Affected files: [list paths]
- Estimated effort: [S/M/L]
2. **Task**: [...]
### Testing
- **Unit Tests**: [Test files to create/modify]
- **Integration Tests**: [Test scenarios]
- **Validation**: [How to verify this phase works]
### Dependencies
- **Blocked by**: [Earlier phases that must complete first]
- **Blocks**: [Later phases that depend on this]
### Key Patterns
- [Pattern 1]: [How it applies]
- [Pattern 2]: [How it applies]
### Known Risks
- **Risk**: [What could go wrong]
- **Mitigation**: [How to prevent or handle]
### Validation Checklist
- [ ] All implementation tasks completed
- [ ] Unit tests passing (no new failures)
- [ ] Type checker clean (`bun x tsc --noEmit`)
- [ ] Storybook loads and relevant stories render
- [ ] Integration tests passing
- [ ] Code review sign-off
### Handoff Criteria
Phase is complete and ready for next phase when:
- All success criteria met
- All validation checklist items passed
- No critical bugs or regressions introduced
Phase Definition Quality Checks
✅ Specificity — Are tasks concrete with file paths? (not "refactor parser" but "update timer.parser.ts to handle X") ✅ Independence — Can this phase be worked on mostly independently? ✅ Testability — Is there a clear way to validate this phase works? ✅ Effort Sizing — Does it fit in 2-5 business days? ✅ Dependencies — Are all blocking dependencies identified? ✅ Patterns — Do implementation tasks align with project conventions?
Action: Document each phase in the template above.
Phase 4: Create GitHub Issue Specifications
For each phase, produce a GitHub issue specification that includes:
Issue Template Structure
---
title: "[Phase N] [Phase Name]"
labels:
- phase
- phase-N
- features # or bugfix, refactor, etc.
milestone: [Relevant sprint/milestone]
---
## Overview
[1-2 sentence summary of the phase objective]
## Success Criteria
- [ ] [Measurable outcome 1]
- [ ] [Measurable outcome 2]
- [ ] [Measurable outcome 3]
## Implementation Tasks
### Task 1: [Specific Task]
- **Files affected**: [file1.ts, file2.tsx]
- **Changes**: [Specific changes to make]
- **Test coverage**: [What tests should cover this]
### Task 2: [...]
## Testing Strategy
- **Unit Tests**: [Location and approach]
- **Integration Tests**: [Location and approach]
- **Validation Steps**:
1. [Step 1]
2. [Step 2]
3. [Step 3]
## Acceptance Criteria
- [ ] All code changes implemented
- [ ] Unit tests written and passing
- [ ] Type checking clean
- [ ] Storybook stories updated/created if needed
- [ ] Code review approved
- [ ] No regressions in existing tests
## Dependencies
- **Blocked by**: [Link to blocking issues]
- **Blocks**: [Link to dependent issues]
- **Related**: [Link to related issues]
## Resources
- **Estimated Effort**: [S/M/L - days]
- **Complexity**: [Low / Medium / High]
- **Risk Level**: [Low / Medium / High]
## Technical Notes
- [Key pattern or consideration 1]
- [Key pattern or consideration 2]
- [Known gotchas or constraints]
## References
- **Brainstorm Analysis**: [Link to brainstorm issue/document]
- **Architecture**: See AGENTS.md "[Section]"
- **Similar Examples**: [References to similar features]
Issue Quality Checklist
✅ Clarity — Would a developer understand exactly what needs to be done? ✅ Completeness — Are all necessary tasks listed? ✅ Testability — Are testing expectations clear? ✅ Dependencies — Are blocking/blocked relationships explicit? ✅ Effort — Is the estimated effort realistic? ✅ Acceptance — Are acceptance criteria objective and measurable?
Action: Create issue specifications for all phases.
Phase 5: Plan Interdependencies & Delivery Timeline
Map out the dependency graph and execution timeline:
Dependency Analysis
- Identify Sequential Dependencies — Phases that must happen in order
- Identify Parallel Work — Phases that can happen simultaneously
- Identify Blocking Risks — High-risk phases that should happen early
- Estimate Critical Path — Minimum time to complete all phases
Timeline Planning
Create a roadmap showing:
- Estimated start and end dates for each phase
- Which phases can run in parallel
- Key milestones and validation gates
- Risk checkpoint dates
Example timeline:
Week 1:
Phase 1: Core Types & Interfaces (Mon-Tue)
Phase 2: Behavior Implementation (Tue-Thu)
Week 2:
Phase 3: Parser Integration (Mon-Wed)
Phase 2 Validation (Wed) — GATE before Phase 3
Phase 4: Component Layer (Wed-Fri)
Week 3:
Phase 5: Integration & E2E Tests (Mon-Thu)
Phase 6: Performance & Polish (Thu-Fri)
Critical Path Visualization
Phase 1 → Phase 3 → Phase 5 → Phase 6 [CRITICAL]
↓ ↓
Phase 2 → Phase 4 ↗
Action: Document the full dependency graph and estimated timeline.
Phase 6: Risk Assessment & Mitigation
For each phase, identify and mitigate risks:
Risk Matrix
| Phase | Risk | Impact | Probability | Mitigation |
|---|---|---|---|---|
| Phase N | Risk description | High/Med/Low | High/Med/Low | Strategy to prevent/handle |
Common Risk Categories
- Architectural Mismatch — Solution doesn't align with existing patterns (Mitigation: Early code review with architecture lead)
- Integration Complexity — More complex than estimated when touching multiple systems (Mitigation: Spike phase to validate integration approach)
- Performance Regression — Changes cause measurable performance degradation (Mitigation: Performance tests in phase, benchmarking validation)
- Scope Creep — Phase reveals additional requirements (Mitigation: Tight definition of complete vs. future work)
- Type System Issues — TypeScript changes cause widespread compilation errors (Mitigation: Type check early, communicate type changes)
- Testing Coverage Gaps — Test harness doesn't support new patterns (Mitigation: Early test spike, explore test harness extensions)
Action: Complete risk matrix and mitigation strategies.
Phase 7: Validation & Handoff Criteria
Define how to validate the entire plan before execution:
Pre-Execution Validation
- All phases have clear success criteria and acceptance conditions
- Dependencies are correctly identified and flow forward
- Each phase has an estimated effort that fits in a work sprint
- High-risk phases are scheduled early
- Testing strategy covers unit, integration, and end-to-end scenarios
- Team has access to all resources and dependencies needed
- Brainstorm output fully informs all phases (no missing information)
- Edge cases and error scenarios are addressed in appropriate phases
Phase Completion Checklist
Each phase must satisfy BEFORE moving to the next:
- All implementation tasks completed
- All unit tests written and passing
- All integration tests passing for this phase
- Type checker clean (
bun x tsc --noEmit) - Storybook stories created/updated and rendering correctly
- Manual validation of success criteria completed
- Code review approved by at least one reviewer
- No regressions in broader test suite (
bun run test:all) - Documentation/comments added for non-obvious code
- Performance validated (if applicable)
Plan Sign-Off
The plan is ready for implementation when:
- ✅ All phases documented with clear tasks and success criteria
- ✅ Dependencies validated and timeline realistic
- ✅ Risk assessment completed with mitigation strategies
- ✅ Team has reviewed and approved the plan
- ✅ GitHub issues created from phase specifications
- ✅ Milestone/sprint assignments complete
Output Format
Structure your plan delivery as follows:
# Implementation Plan: [Feature/Fix Name]
## Executive Summary
[1-2 paragraph overview of the approach, phases, and timeline]
## Brainstorm Reference
- **Brainstorm Issue**: [Link]
- **Recommended Solution**: [Brief summary]
- **Key Implementation Steps**: [Bulleted high-level steps]
## Delivery Phases Overview
| Phase | Name | Duration | Risk | Dependencies |
|-------|------|----------|------|--------------|
| 1 | Core Types | 2 days | Low | None |
| 2 | Main Logic | 3 days | Med | Phase 1 |
| [...]| ... | ... | ... | ... |
## Detailed Phase Specifications
### Phase 1: [Phase Name]
[Use Phase Template from Phase 3 above]
### Phase 2: [Phase Name]
[...]
## Dependency Graph
[ASCII or description of execution flow and parallelization]
## Risk Assessment & Mitigation
[Risk matrix with mitigation strategies]
## Implementation Timeline
[Timeline visualization with estimated dates]
## GitHub Issues to Create
1. [Issue spec for Phase 1]
2. [Issue spec for Phase 2]
3. [...]
## Success Criteria for Full Delivery
- [ ] All phases complete with sign-off
- [ ] No new regressions or type errors
- [ ] Performance benchmarks met (if applicable)
- [ ] User-facing features working as described in brainstorm
- [ ] Documentation updated (Storybook, README, docs/)
## Next Steps
1. Review plan with team
2. Create GitHub issues from phase specifications (using implement.md template)
3. Assign issues to milestone and team members
4. Proceed with Phase 1 implementation
---
## Phase 8: Create GitHub Issues for Implementation Phases
**Handoff each phase to the implementation stage:**
For each phase in your delivery plan, create a new GitHub issue using the **Implement template** (`.github/ISSUE_TEMPLATE/implement.md`).
### GitHub Issue Template Selection
Use: `.github/ISSUE_TEMPLATE/implement.md`
### Issue Structure for Each Phase
```markdown
---
title: "[Implement] [Phase N] [Phase Name]"
labels:
- phase
- phase-N
- implement
- features # or bugfix, refactor, etc.
milestone: [Sprint/Iteration]
assignees: []
---
## Plan Reference
**Parent Plan Issue**: #[parent issue number] — "[Plan] [Feature Name]"
**Brainstorm Reference**: #[brainstorm issue number]
**Phase**: N of [total phases]
## Phase Objective
[Copy the phase objective from your plan — 1-2 sentences]
## Core Artifacts from Plan
- **Phase Name**: [Phase N: Name]
- **Duration**: [2-5 business days]
- **Risk Level**: [Low/Medium/High]
- **Success Criteria**: [Copy the checklist from plan phase spec]
## Implementation Tasks
[Copy each task from the plan phase, formatted as:
### Task 1: [Task Title]
- **Files affected**: [list]
- **Changes**: [specific changes]
- **Test coverage**: [what to test]
Task 2: [...]
]
## Testing Strategy
- **Unit Tests**: [From plan]
- **Integration Tests**: [From plan]
- **Validation Steps**: [From plan]
## Dependencies
**Blocked by**: [Link to earlier phase issues if any]
**Blocks**: [Link to later phase issues]
**Related**: [Link to other related issues]
## Acceptance Criteria
[Copy the acceptance criteria checklist from plan phase spec]
## Technical Notes
- **Key Patterns**: [Patterns identified in plan]
- **Complexity**: [Low/Medium/High]
- **Known Risks**: [From plan]
- **Constraints**: [From plan]
## Resources
- See parent plan issue for full context
- Architecture: AGENTS.md
- Test Harness: tests/harness/
- Pattern Examples: [Reference similar existing code]
What to Include
From your plan output, copy these sections into each phase issue:
- Phase Objective — Exact objective statement from plan
- Success Criteria — The checklist from plan phase template
- Implementation Tasks — All tasks with file paths and specific changes
- Testing Strategy — Unit, integration, validation approach
- Dependencies — Blocked by / Blocks relationships
- Acceptance Criteria — Objective, measurable criteria from plan
- Technical Notes — Key patterns, risks, constraints
Key Artifacts to Reference
Link to and identify these plan artifacts:
- The parent plan issue (helps implement phase understand broader context)
- The brainstorm issue (complete problem analysis)
- Dependencies — Earlier phases that must complete first
- Blocking relationships — Later phases that depend on this
- Similar existing code — Examples of patterns to follow
Issue Organization
Organize issues hierarchically:
Parent: [Plan] Feature Name
└─ Child: [Implement] Phase 1: Core Types
└─ Child: [Implement] Phase 2: Main Logic
└─ Child: [Implement] Phase 3: Components
└─ Child: [Implement] Phase 4: Integration
Link them together:
- Phase 1 issue → "Blocks #[Phase 2 issue]"
- Phase 2 issue → "Blocked by #[Phase 1 issue]", "Blocks #[Phase 3 issue]"
- All phases → "Related to #[Plan issue]"
Issue Labels
For each phase issue, add labels:
phase— This is a delivery phasephase-N— Phase number (phase-1, phase-2, etc.)implement— Implementation phase designationfeatureorbugfixorrefactor— Type of work- Domain labels (e.g.,
parser,runtime,components)
Validation Before Creating Issues
For each phase issue:
- Issue title follows format: "[Implement] [Phase N] [Phase Name]"
- All implementation tasks are listed with specific file paths
- Success criteria are copied exactly from plan
- Testing strategy is detailed and clear
- Dependencies are correctly identified and linked
- Parent plan issue is referenced
- Related phase issues are linked (blocked by/blocks)
- Acceptance criteria are objective and measurable
- Issue is actionable for implementation phase agent
Creation Pattern
Create issues in this order:
- Create all phase issues
- Link dependencies: Set "blocked by" and "blocks" relationships
- Add to milestone and assign
- Add labels consistently across all phase issues
- If parallelizable, note which phases can happen simultaneously
Action: Create GitHub issues for each phase using implement.md template, with clear dependencies and artifact references for handoff to implementation phase.
---
## Phase 8: Handoff Consistency with Brainstorm
**Ensure smooth information flow between prompts:**
### Input/Output Contract
**BRAINSTORM PROMPT** produces:
- Requirement Analysis (problem, success criteria, scope)
- Code Exploration (relevant files, existing patterns)
- Proposed Solutions (2-3 options with tradeoffs)
- **Recommended Solution** with implementation steps
- Testing strategy and validation steps
**PLAN PROMPT** consumes:
- The recommended solution
- Implementation steps
- Testing strategy
- Validation steps
- Affected components and code style patterns
**PLAN PROMPT** produces:
- Phased decomposition of the recommendation
- GitHub issue specifications with clear tasks
- Dependency graph and timeline
- Risk assessment
- Phase validation criteria
### File Structure for Consistency
When referencing the brainstorm analysis in the plan:
```markdown
## Brainstorm Reference
- **Issue**: #[number] — "[Feature] Brainstorm"
- **Recommendation**: [Copy the "Recommended" section title from brainstorm]
- **Implementation Steps** (from brainstorm):
1. [Step 1 from brainstorm]
2. [Step 2 from brainstorm]
3. [...]
When creating GitHub issues referencing the plan:
## Parent Plan
- Link to plan document or issue
- Reference the phase this issue belongs to
- Link to related phase issues (dependencies)
Common Field Mapping
| Brainstorm Section | Plan Section | GitHub Issue Field |
|---|---|---|
| Implementation Steps | Phase Tasks | Task checklist |
| Affected Components | Phase Files | Implementation Tasks |
| Testing Strategy | Phase Testing | Testing section |
| Validation Steps | Phase Validation | Acceptance Criteria |
| Success Criteria | Phase Success Criteria | Success Criteria + Acceptance Criteria |
Best Practices
- Preserve Brainstorm Context — Keep reference to the brainstorm output throughout the plan for traceability
- Break Into Right-Sized Pieces — Phases should be achievable in a sprint, not multi-week work
- Front-Load Complexity — High-risk or novel patterns should be early phases to validate feasibility
- Plan for Testing — Don't defer testing to the end; build validation into each phase
- Explicit Dependencies — Every "blocked by" and "blocks" relationship should be documented
- Risk Transparency — Identify and communicate risks early, with concrete mitigations
- Clear Acceptance — Each phase should have objective accept/reject criteria
- Team Communication — Plans should be readable by developers, PMs, and reviewers
Common Pitfalls to Avoid
❌ Vague Tasks — "Implement feature" instead of "Add useTimer() hook to src/hooks/useTimer.ts with tests"
❌ Missing Dependencies — Phases that silently depend on earlier work without documenting it
❌ Over-Scoping Phases — Trying to fit a week's work into one phase
❌ Deferred Testing — Planning tests as a final phase instead of within each phase
❌ Ignoring Edge Cases — Not addressing error scenarios and interactions identified in brainstorm
❌ No Risk Mitigation — Identifying risks but not planning how to prevent or handle them
❌ Weak Acceptance Criteria — Success criteria that are subjective or immeasurable
Resources
- Project Overview: AGENTS.md (canonical source for architecture and patterns)
- Code Style: AGENTS.md "Code Style Guidelines" section
- Test Harness: tests/harness/ directory and AGENTS.md "Test Harness" section
- Architecture: AGENTS.md "Project Architecture" section
- Related Brainstorm: .github/prompts/brainstorm.prompt.md
- Issue Templates: .github/ISSUE_TEMPLATE/ directory