Prompt file imported from swayerloren/KICAD_ENGINE (
.codex/prompts/VERIFY_BEFORE_FAB.md). Copyright stays with the author.
Verify Before Fabrication
Use this prompt before any KiCad manufacturing package is treated as ready for fabrication.
Startup Requirements
Before verification:
- Read root
AGENTS.md. - Read all
00_CODEX_START/files in the required order. - Confirm the active project name and path.
- Load relevant memory and history.
- Confirm outputs will be written only to approved output folders.
Required Verification
Run or complete:
- ERC.
- DRC.
- BOM export.
- Footprint checks.
- Datasheet checks.
- Connector checks.
- Polarity and orientation checks.
- Power input and protection checks.
- Mounting hole checks.
- Board edge clearance checks.
Fabrication Outputs
Export fabrication files only into:
05_OUTPUTS- The active project's
fabricationfolder
Allowed fabrication exports include:
- Gerber files.
- Drill files.
- STEP files.
Do not overwrite prior release outputs without creating a dated or versioned output folder.
Finality Rule
Mark the output NOT FINAL if any verification is incomplete, blocked, stale, or unreviewed.
Manufacturing output is not final until ERC, DRC, BOM, footprint, netlist, datasheet, and visual review are complete.
Reports
Save verification reports in:
02_HISTORY\erc_drc_reports\02_HISTORY\fabrication_reviews\- The project-specific history folder when appropriate