Orchestrate — end-to-end ticket lifecycle

Drive one ticket through all seven phases with maximum traceability, correctness, and completeness. This is the full-rigor, opt-in version of ticket work: invoking it means the user wants every artifact and every gate — do not scale the ceremony down because the ticket looks small. The user decides whether to invoke this; you do not decide to abbreviate it.

DO NOT PULL IN MODULES UNLESS ABSOLUTELY NECESSARY. WE WANT CONTEXT TO BE SIGNAL, NOT NOISE. Load only the current phase's listed inputs plus the orchestration ledger. Never preload later phases' references.

Visible progress — maintain a running todo list

Harness step-visibility differs: Cursor's plan mode shows a checklist natively, but the Codex and Claude Code harnesses surface no step list during a working run. So maintain an explicit todo list visible in the chat regardless of harness, and check items off as you complete them — this is the user's window into where the run is. Use the harness's native todo tool where one exists; otherwise print the checklist inline.

The items are not yours to invent. They come from steps.csv:

scripts/render-sequence.ps1 -Checklist -Phase <N>

That emits one checkbox per step, each carrying its stable id:

### PHASE 3 — Probe and spec · Working
- [ ] `P3.reconcile`      trace any question the code can answer
- [ ] `P3.grill`          run grill-me
- [ ] `P3.decisions`      write the locked decisions

Post that at the start of each phase and check items off as you go. Cite the id when you say what you are doing next — "next is P3.spec" — so the user can see the exact step rather than a paraphrase.

Why the ids matter more than the checkboxes. An invented sub-step list lets a step disappear silently: nobody can tell the difference between a list of six that should have been seven and a list of six that was always six. Sourcing the list from steps.csv means a missing item is visible as a missing id. It costs almost nothing per phase and it is the cheapest guarantee in this whole skill that an action was actually addressed rather than skipped.

Keep one item in progress at a time, and refresh the list at every phase transition. This is a requirement, not optional narration.

The ticket's Why (living doc — every phase)

The ticket carries a living "Why" doc (<slug>-why-these-changes.md, per docs/why-these-changes.md) — the overarching why of the whole ticket, whose heart is the class of problem being solved. It is created early (Phase 1) so the understanding is established before the work runs ahead of it, and it is always open for update through every phase. At each phase, check whether the why moved — the problem, the class, the bug, the code, an assumption — and if it did, log it in the why-log, explicitly labeled with the phase and whether it's a new understanding, a course change, or a discarded path. Capture the reasoning trail (what was obvious, what wasn't, what changed after learning more, what got us to the solution, what was noise), not just conclusions. This is high-level and distinct from the testing-implementation doc's scenarios. If nothing moved in a phase, that is fine; an unlogged change is not.

The ticket's acceptance criteria (living doc — every phase)

The ticket's job stories (stories/, per ../job-story/SKILL.md) are the yardstick the finished work gets held against — a User Story and Acceptance Criteria for each distinct problem in the request. They are drafted at Phase 0 from the verbatim request alone (they do not wait on the investigation), accepted at Phase 3 once their open questions close against the locked decisions, and open for revision at every phase in between.

Same discipline as the why-log: at each phase, check whether a story moved — a criterion added or reworded, an open question closed, a story split, a user type corrected — and if it did, append a Story log entry labeled with the phase. Nothing moving in a phase is fine; an unlogged change is not. While a story is draft, revise it in place; once accepted, move it to dnu/ unchanged and write the next version.

The story owns what done means; the spec owns how it gets built. Investigation artifacts (Problem Check, report §8/§10) are peer inputs that inform the stories — never the authority on their criteria. Where a story and a spec disagree on what done means, the story wins or the story changes on the record — never both quietly.

No status bookkeeping

An artifact either exists or it does not. Do not maintain status fields across phases.

Earlier versions had this skill add a changelog Plans row and then walk it from active to implemented across three phases. That is gone. It cost tokens on every phase, nobody ever read it, and it invented a state machine where a boolean was wanted: did this happen, yes or no.

So:

  • Do not add or restatus a changelog Plans row anywhere in this lifecycle.
  • Do not infer intermediate states — no blocked, no in progress, no pending. The ledger (orchestration.md) still tracks phase state, because that is what a resumable run needs. That is the one place status lives.

Records of what happened are a different thing, and they stay. A session log entry is not a status field — it says what the phase produced, which is exactly what the changelog exists to carry across sessions.

Every Working phase ends with a changelog session log entry. Phase 0 creates the changelog; Phases 2, 3, 5 and 6 each append an entry naming what that phase emitted, dated in UTC. Plan phases 1 and 4 write nothing, so anything they would record folds into the next Working phase, the same as every other staged write.

That consistency is the point. Before this, only Phase 5 had an entry, and only because a commit forced it — so Phase 2 could write nine artifacts and Phase 6 could close the ticket with nothing in the cross-session record.

Invocation and inputs

Resolve the ticket in this order:

  1. PRDV-XXXXX id<Project> is the system (atlas / callisto / europa / triton / …) resolved per the ticket-changelog rule; the ticket changelog lives at docs/<system>/PRDV-XXXXX-changelog.md.
  2. Project + slug (e.g. "orchestrate WorkLists duplicate-card-option") → docs/<Project>/tickets/<slug>/.
  3. Free brief, no id → derive <slug> from the brief (kebab-case, at most six words); ask once for <Project> if it is not inferable from the working directory or branch.
  4. Nothing → ask exactly one question: "Paste the ticket/request text (or id) and name the project." Never fabricate or paraphrase a ticket into existence.

If the ticket folder already exists, follow State ledger and resume below instead of starting fresh.

Ticket folder layout

Every artifact this skill produces lives in one canonical layout, rooted at C:\dustin-thomason\docs\<Project>\tickets\<slug>\ — organized, obvious by filename:

docs/<Project>/tickets/<slug>/            (always under the dustin-thomason repo — see Repo boundary below)
  original-ticket.md                              Phase 0
  orchestration.md                                phase-state ledger (Phase 0 scaffolds)
  <slug>-why-these-changes.md                     Phase 1 created → updated every phase (why-log) → Phase 6 finalized
  <slug>-future-development-concerns.md           Phases 1–4, created on first concern only
  <slug>-implementation-plan.md                   Phase 4 approved → saved verbatim at Phase 5's first action, then frozen
  <slug>-pr-draft.md                              Phase 2 shell (empty template) → Phase 5 filled
  stories/
    <slug>-job-stories-index.md                   Phase 0 created → updated whenever a story moves
    <slug>-job-story-<NN>-<short>.md              Phase 0 draft → revised Phases 1–2 → accepted Phase 3
  investigations/
    <slug>-recon-and-plan.md                      Phase 1 approved → saved verbatim at Phase 2's first action, then frozen
    <slug>-investigation.md                       Phase 2 (§13+ addenda appended, never rewritten — see Phase 2)
    <slug>-coverage-ledger.md                     Phases 1–2
    <slug>-diagrams.md                            Phase 2
  specs/
    <slug>-spec.md                                Phase 3
    <slug>-locked-decisions.md                    Phase 3 — standard once decisions exceed a handful (see Phase 3)
  testing/
    <slug>-test-plan.md                           Phase 2 seed → Phase 3 refine → Phase 5 revise (after approval, before impl) → execute
    <slug>-testing-implementation.md              Phase 5 — scenarios stress-tested (+ any change hung off each), for the PR comment
  dnu/                                            superseded artifacts move here, names unchanged

PRDV tickets may prefix artifact filenames with PRDV-XXXXX- instead of the slug; personal projects use the slug. Superseded or redone artifacts move to dnu/ — never deleted, never renamed.

Repo boundary (docs vs implementation)

Every orchestration artifact lives in dustin-thomason, always — never inside the implementation repo or folder, regardless of where <Project>'s actual code lives. This mirrors the ticket-changelog rule's boundary ("all changelog and Plans data stays in this repo"). A ticket whose code lives at C:\Users\<user>\...\Browser Extensions\<Project>\ or in an app repo like atlas-front-end still gets its original-ticket.md, ledger, report, spec, and every other artifact under C:\dustin-thomason\docs\<Project>\tickets\<slug>\.

The implementation location is recorded, not used as a docs root: capture it in original-ticket.md's Context Paths and in the orchestration ledger's Artifacts column (Phase 5 onward) when code changes land there. If the target repo has no .git (e.g. a loose extension folder), say so in the ledger notes and skip the branch step — do not relocate docs there instead.

If this boundary is ever unclear at invocation (a free brief naming a folder that could be mistaken for the docs root), ask once before creating anything — this was reached only by a live user correction in a prior run, not caught by the skill itself.

The phase map

Phase Name Mode Output artifacts Advance
0 Capture Working original-ticket.md, orchestration.md, job stories (draft) + index gate → HANDOFF (Plan)
1 Recon and plan Plan approved recon-and-plan doc (findings + emission todos + staged coverage rows) gate → plan approval
2 Report Working investigation report, coverage ledger, diagrams, test-plan seed gate → AUTO-ADVANCE to 3
3 Probe & spec Working locked-decision ledger, accepted job stories, spec, spec submitted to its reviewer, refined test plan gate → HANDOFF (Plan)
4 Prep Plan approved implementation plan gate → plan approval
5 Implement Working reviewer's spec response recorded, code, executed test plan, session log, PR gate → HANDOFF (Idle)
6 Wrap up Working finalized why doc, closed stories, closed ledger, review summary END — you review manually after

Mode handling (harness-agnostic)

  • Never assume you can switch Plan/Working modes. Cursor and Codex have no agent-callable switch; mode is the user's.
  • Claude Code exception: if a plan-mode tool (EnterPlanMode) is available in the session, you MAY use it to cross a Working→Plan boundary without stopping — but still print the handoff block first, so the ledger and the user stay synchronized.
  • Handoff boundaries: 0→1, 3→4, 5→6. The 1→2 and 4→5 boundaries are crossed by plan approval itself (approving the plan is the handoff) — post the following phase's checklist at its start instead.
  • Same-mode boundary 2→3: auto-advance, no stop — but Phase 2's checklist must be fully checked before Phase 3 begins.
  • Open, untested assumption — whether scripts/messages can run while in Plan mode at all (some harnesses restrict non-readonly tool calls, including shell/Bash, during Plan mode). Status: open. Confirm/revise by: attempt a script call while genuinely in Plan mode in each harness in use and record the observed result (allowed / blocked / silently no-op) as a coverage-ledger or ledger-notes entry. Until confirmed either way, the design below never depends on running anything during a Plan phase — see Progress notifications.

Progress notifications

Because handoffs stop and wait, and the user may not be watching, every phase completion sends a push notification — not only Phase 6 — per the agent-completion-notification rule. This directly works around the open Plan-mode question above rather than resolving it: notifications are sent only from Working-mode moments, never attempted from inside a Plan phase.

  • Working-phase completions (0, 2, 3, 5, 6) notify immediately, before printing that phase's handoff block (or, for the auto-advancing Phase 2, alongside its completed checklist).

  • Plan-phase completions (1, 4) defer their notification to the first action of the next Working phase, batched with that phase's own "starting" notice — the same deferred pattern already used for their ledger writes (deferred (plan mode)).

  • A guard stop notifies too, not only a phase completion — an unattended run's stop otherwise lives only in a transcript, which is exactly when nobody is watching. Message names the phase and the guard that fired.

  • Resolve the dustin-thomason repo root the same way agent-completion-notification does, then run (adjust for cwd):

    # from the dustin-thomason repo root
    .\scripts\notify-agent-complete.ps1 -Status "Completed" -Message "<Project>/<slug>: Phase <N> done, next is Phase <M> (<mode>)"
    
    # from elsewhere in the workspace (e.g. the implementation repo)
    & "<dustin-thomason>\scripts\notify-agent-complete.ps1" -Status "Completed" -Message "<Project>/<slug>: Phase <N> done, next is Phase <M> (<mode>)"

Keeping the WorkLists card current

When the ticket has a WorkLists card, each Working phase writes its progress to that card. The rule that owns the behaviour is worklists-card-sync — load it before the first write. In outline:

  • Phase 0 records the card id (P0.board-id). Either the user supplies it, or — when the ticket has no card yet — the agent creates the ticket from the designated card template and takes the new id from the creation response. State which path was taken, and on the creation path report the id created.
  • Each Working phase writes twice: currentStep at the phase's start, then its checklist rows and nextUp at completion. Plan phases defer their phase-start write to the next Working phase, like their ledger writes.
  • Rows are marked only with evidence. The checklist's format is the contract, not any template, so the agent reads the rows as written and reasons about which its phase actually satisfied. Leaving a row unmarked is always safe; every unmarked row is named in the phase report.
  • A guard stop notifies (see Progress notifications). A board write that fails only because the server is down is a skip, not a stop: record it in the ledger, do not notify, and let the phase finish. The board reflects the work; it does not gate it.

This is skipped entirely when the ticket has no WorkLists card — record skipped (no WorkLists card) on the board step and carry on.

The handoff block

At each handoff boundary, emit this block verbatim with values filled, then stop — output nothing after it:

==================== ORCHESTRATION HANDOFF ====================
Ticket:        <Project>/<slug>
Phase done:    Phase <N> — <name>
Artifacts:     <repo-relative paths | n/a>
Ledger:        docs/<Project>/tickets/<slug>/orchestration.md (updated)
Next phase:    Phase <M> — <name>
Required mode: <Plan | Working | Idle>
Your move:     Switch to <mode> mode and say "go".
               Already in <mode>? Just say "go".
               Also accepted: "skip to phase <X>" | "redo phase <N>"
===============================================================

The checklist is the gate

Agents deprioritize instructions they judge redundant. The visible checklist is what stops that, and it replaces the hand-written gate blocks this section used to carry.

Before advancing out of any phase, every item in that phase's checklist is checked off. An unchecked item blocks the advance — say what is missing and complete it first. Confidence is not a substitute for the check.

What satisfies each item is the done column in steps.csv. That is the single source of truth for every obligation in this lifecycle. Phase-by-phase "gate evidence" lists used to live here in prose, which meant the same requirement existed in two places and drifted in both — so they were folded into done and removed. If you are looking for what proves a step happened, read its row. Nothing else carries it.

To see whether the artifacts actually landed:

scripts/check-steps.ps1 -TicketFolder docs/<Project>/tickets/<slug> -ThroughPhase <N>

Plan-mode phases (1, 4) cannot write files. Their outputs are staged and land as the first action of the next Working phase, so their checklist items are satisfied by the staging, not by a file on disk.

Entry check — before touching anything, not just before leaving. A checklist only catches a phase on the way out. A prior orchestrated run edited implementation-repo files during Phase 0/1, before capture and investigation existed, and was only caught because the user noticed and reverted it. So: before doing any work in Phase 2 or later, confirm every earlier phase's ledger row reads done or skipped (reason) — if it does not, stop and close the gap first. Concretely, do not create, edit, or run anything in the target implementation repo/folder until Phase 0 and Phase 1 both read done. And done means the phase's steps actually met their done conditions — not that code was drafted or an outcome was expected. That was missed once too: implementation was nearly called complete before any live proof existed.

State ledger and resume

orchestration.md is scaffolded at Phase 0 from this template:

# Orchestration — <Project>/<slug>

| WorkLists card | <todo-id, or "none"> |

| Phase | Status | Artifacts | Date | Notes |
| --- | --- | --- | --- | --- |
| 0 Capture | pending | | | |
| 1 Recon and plan | pending | | | |
| 2 Report | pending | | | |
| 3 Probe & spec | pending | | | |
| 4 Prep | pending | | | |
| 5 Implement | pending | | | |
| 6 Manual review | pending | | | |

Resume: Phase 0 — Working mode

Status vocabulary: pending / in-progress / done / skipped (reason) / redone (see dnu/). Update the row and the Resume: footer at every phase transition (deferred to the next Working action for plan-mode phases).

Resume protocol — when invoked and the ticket folder already exists:

  1. Read orchestration.md; verify against disk (do the listed artifacts exist?). Disk facts win — flag any discrepancy, correct the ledger, continue from the corrected state.
  2. Announce a one-line status ("Phases 0–2 done; next: Phase 3, Working mode") and emit the handoff block for the next phase.
  3. Ledger missing but ticket artifacts exist (pre-skill ticket): reconstruct the ledger from disk, show it, get the user's confirmation before proceeding.
  4. Neither exists: fresh Phase 0.

Phase 0 — Capture the original ticket (Working)

  • Reads: docs/original-ticket-artifact.md; ../job-story/SKILL.md (execute it for the job stories below); the canonical changelog per the ticket-changelog rule (task-start alignment — resolve or scaffold it; personal projects use docs/<project>/'s project changelog). For ClickUp-backed tickets, also read ../../docs/browser-loop-setup.md and load the browser-loop guardrails before using Playwright/browser observation.
  • Do:
    1. Create the ticket folder in the canonical layout.
    2. For ClickUp-backed tickets, use Playwright/browser observation as the preferred capture path: open the active ClickUp ticket page, identify the visible ticket fields and metadata from the rendered UI, and export the captured ticket to Markdown as {ticket-id}-original-ticket.md. Use API access only as a fallback or cross-check, not as the default source of truth. ClickUp requires an authenticated session — a freshly Playwright-launched browser context has no login and cannot see the page. Attach to a real, already-logged-in Chrome instead, per browser-loop-setup.md's "Attaching to an authenticated browser session" recipe; do not attempt a fresh headless/incognito launch against ClickUp and fall back to guessing selectors when it fails to load — that already happened once and cost a manual recovery.
    3. Create original-ticket.md (or {ticket-id}-original-ticket.md for PRDV tickets) per the artifact doc — the request verbatim, capture metadata, explicit constraints, context paths. No findings, no recommendations.
    4. Draft the job stories per ../job-story/SKILL.md — synthesize the verbatim request, split it into one story per distinct problem, run the full sequence, and write stories/ plus its index with each story draft. Anything the request left undecided becomes that story's Open Questions; do not decide it here. This is the acceptance-criteria baseline every later phase is measured against, and it is established before the investigation so the investigation cannot quietly define what done means.
    5. Record the WorkLists card id in original-ticket.md's Context Paths and in the ledger — supplied by the user, or returned by creating the ticket from the designated card template. Never search for it. See Keeping the WorkLists card current.
    6. Scaffold orchestration.md from the template above; mark Phase 0 done.
    7. Align with the changelog's Current state / Plans / Attempt history before anything downstream.
  • Advance: notify (Progress notifications), then handoff → Phase 1 (Plan).

Phase 1 — Recon and plan (Plan)

What this phase is. Not planning where to look — recon. Plan mode is used as the operative method for collecting methodically: the agent reads the ticket text and traces the code, reaches its findings, and emits them as a written plan you approve. The name matters because it sets the right expectation — by the time you see the plan, the looking is done, and what you are approving is a set of findings plus the plan to record them. That is deliberate: the approval sits at the last moment before any durable artifact is written, and the first moment there is something substantive to judge. A misdirected recon costs one pass and leaves nothing wrong on disk; a misdirected write-up costs every artifact downstream that cites it.

The plan is the durable carrier. Plan mode's output is a written document, not working memory — that is what makes this phase's findings survivable. It must carry the findings, not just the emission todos, so Phase 2 is re-derivable from it if context is lost. It is saved verbatim as investigations/<slug>-recon-and-plan.md at Phase 2's first action and frozen thereafter, the same way original-ticket.md's Original Request is: later deviation is recorded where deviation belongs — a coverage-ledger reopen reason, or a why-log course change — never by editing the approved plan.

  • Reads: ../investigation/SKILL.md (execute it — this phase IS that method, run inside this orchestration); ../investigation/docs/investigation-software-gaps.md (mandatory software lens for software-domain tickets: contract alignment, surface enumeration, protect-the-neighbors, detection gap, red→green test, repro recipe); ../investigation/docs/investigation-coverage-ledger.md (the consult protocol). Problem Check is already embedded in the method's Step 1 — do not load it separately. Do not load investigation-question-coverage.md (meta-audit, not an operational input).
  • Do:
    1. Consult prior coverage ledgers FIRST — before opening any investigative branch, run the consult protocol (grep docs/<Project>/tickets/*/investigations/*-coverage-ledger.md for the subsystems in play). Reuse covered ground; reopen only per the four reopen conditions, with the reason recorded. Stage the mandatory consult log line for the ledger.
    2. Execute the investigation method steps 1–7 on the ticket (everything but the emit). Two disciplines this phase must not skip: (a) the Problem Check lens (method Step 1) — its Asked / Answered / Should-ask + Conflation / Thin / Off findings, each grounded in a trimmed quote from the ticket text ("nothing here" is a valid flag, silence is not), carry into report §2; (b) the Step 7 reconcile — classify every open question on the fact-vs-decision axis, resolve the code-discoverable ones by tracing the evidence now, and for any question the current structure genuinely can't answer, capture the code evidence that proves why. Stage coverage rows (area, items inspected, findings, status, commit) as you traverse — they become the coverage ledger in Phase 2.
    3. Build the recon-and-plan doc. It records the findings this recon reached — problem class, what was inspected and ruled out, the facts resolved by evidence, the decisions left open with owners — and then the todos to: reconcile against every point of the software lens; emit the report per the template; materialize the coverage ledger (with the consult line); produce the diagrams artifact per ../investigation/docs/investigation-diagrams.md; seed the test plan per docs/test-plan-artifact.md; record any surfaced concerns per docs/future-development-concerns.md. Findings-plus-todos, not todos alone — a plan a later agent could execute after losing all context.
    4. Surface the ticket's Why early. Establish the class of problem and the high-level problems we're solving, and stage the Phase 1 why-log entry (obvious / not obvious / assumptions) for <slug>-why-these-changes.md (per docs/why-these-changes.md). This is the heart of the Why doc — get it on the record before the work runs ahead of the understanding. Plan mode can't write, so the file is materialized at Phase 2's first action.
    5. Reconcile the job stories against what the investigation surfaced. Problem Check's Thin and Conflation flags and the Step 7 fact-vs-decision split are peer inputs to the stories, not their source of truth. Stage: open questions the investigation answered, criteria a finding invalidates, and any story that has to split. Plan mode can't write, so these land at Phase 2's first action.
  • Advance: plan approval (this is the handoff). Ledger row updates and the deferred Phase 1 notification both fire at Phase 2's first action.

Phase 2 — Investigation report (Working)

  • Reads: the approved plan; ../investigation/docs/investigation-report.md (template); ../investigation/docs/investigation-diagrams.md; docs/test-plan-artifact.md.
  • Do:
    1. Update the ledger (Phase 1 done, Phase 2 in-progress), and materialize the deferred Phase 1 writes: save the approved plan verbatim as investigations/<slug>-recon-and-plan.md (frozen once written — see Phase 1); create <slug>-why-these-changes.md (problem class + Phase 1 why-log entry) per docs/why-these-changes.md, and apply the staged job-story reconcile — revised criteria, closed questions, any split — with a Phase 1 Story log entry on each story touched.
    2. Write investigations/<slug>-investigation.md from the template — this path overrides the template's default docs/investigations/ location for orchestrated tickets. The report links out to the diagrams artifact from §5; do not embed large diagrams inline.
    3. Materialize investigations/<slug>-coverage-ledger.md — Consulted line first, then every staged area entry, then the Not-yet-inspected frontier.
    4. Produce investigations/<slug>-diagrams.md — current-vs-target, flows, sequences (race conditions and timing edge cases) as applicable; N/A lines for kinds skipped.
    5. Seed testing/<slug>-test-plan.md from report §9 — each seeded scenario names the acceptance criterion it exercises, or is flagged as coverage with no criterion behind it yet.
    6. Stage the PR draft shell <slug>-pr-draft.md — headings and empty placeholders only, from the PR template in ../../docs/pull-request-workflow.md (title, ClickUp link, Description, Test Evidence, Commit hash, Checklist). Get the head start, but draft the shell, not the content: the body is filled in Phase 5 after testing, because scope can still move in Phases 3–4. Leave a one-line note at the top that it is an unfilled shell.
    7. Do not touch original-ticket.md — it is immutable once captured, and the files this phase produced are recorded in the ledger's Artifacts column instead. Do not add or restatus a changelog Plans row; see No status bookkeeping above.
  • Advance: notify (Progress notifications; deferred Phase 1 notice batches in here too), AUTO-ADVANCE to Phase 3 (same mode) — close out Phase 2's checklist, post Phase 3's, keep going.
  • Reopening a "done" report: if later work (a fast-follow answer, a live-DOM proof, a corrected assumption) needs to change this report after it's marked done, append a numbered addendum section (e.g. "§13. Post-Investigation Addendum — ") dated and evidenced — never rewrite the verdict or earlier sections in place. This preserves the original reasoning trail the same way the coverage ledger and locked-decision ledger already do.

Phase 3 — Probe and spec (Working)

  • Reads: report §8 (assumptions) + §10 (open variables); the job stories' Open Questions (../job-story/SKILL.md); ../grill-me/SKILL.md; ../../docs/qa-to-spec-traceability.md; the spec-writing rule (loads automatically; PRDV app tickets may route through ../write-spec/SKILL.md and the wiki conventions — ask once: sibling spec or wiki).
  • Do:
    1. Before grilling, re-run the Step 7 reconcile on the current open variables. Any question whose answer is discoverable in the code/source — trace it and resolve it yourself via evidence; do not bring a fact to the user to "decide" when the codebase already answers it. Where a question bundles a discoverable fact with a decision, split it: you answer the fact, the user decides the rest. Only genuine decisions reach grill-me.
    2. Run grill-me against the report's remaining open variables and assumptions and every job story's Open Questionsunder the qa-to-spec-traceability workflow: question gate before each question, one question at a time, each answer committed to the locked-decision ledger before the next, rejected paths recorded.
    3. Risk-accepting answers produce BOTH records: the locked-decision row and a concern entry in <slug>-future-development-concerns.md (create on first concern); the row cites the entry.
    4. Accept the job stories. Fold every resolved decision into the criteria it affects, close each story's Open Questions (or carry one forward with a named owner and the reason), set the index rows to accepted, and append the Phase 3 Story log entry. A decision wins on how; the criterion still owns what done means — rewrite it to stay observable rather than importing the design word the decision introduced.
    5. Materialize the locked-decision ledger as its own file, specs/<slug>-locked-decisions.md (question gates resolved + the full LD-### table with source / supersedes-or-rejects / spec destination) — the standard from the first real run, once decisions run past a handful the way they will on any non-trivial ticket. Write specs/<slug>-spec.md: grill-me output informs the spec, it is not the spec. Its required Locked Decisions From Q and A section (per spec-writing / qa-to-spec-traceability) becomes a short summary table that links to <slug>-locked-decisions.md for the full ledger, rather than repeating it — satisfy the spec-writing rule's sections (N/A lines where a section does not apply); frame Problem → Requirement → Solution.
    6. Submit the spec to its reviewer. A spec is a review gate, not a private artifact: on a team where a principal dev owns the design, implementing from an unreviewed spec is the same mistake as implementing from an unread one. Deliver it the way that team actually reviews — where a shared wiki is the review surface, that means pushing a branch and opening a PR, not writing the file locally and calling it submitted. Two shapes recur: the reviewer has not written a spec, so yours is the thing under review; or the reviewer already authored the authoritative spec, in which case submit an addendum carrying only what your investigation added or changed — decisions that extend their spec, deviations from precedent, and defects found in their own documents. Never request a reviewer through GitHub's reviewer mechanism unless the user asks in that moment (git-commit-workflow). If no review is owed, record that as not-applicable naming who owns the spec and why.
    7. Refine the test plan — resolved variables become concrete assertions, each mapped to the acceptance criterion it proves; status refined.
  • Advance: notify (Progress notifications), then handoff → Phase 4 (Plan).

Phase 4 — Prep for implementation (Plan)

  • Reads: the spec; report §11 (handoff table); the test plan. No re-investigation — plan from the artifacts.
  • Do: build a brief implementation plan: Problem → Requirement → Solution framing; ordered steps; branch step per ../../docs/new-branch-get-started.md when repo work begins; test execution mapped to the test plan; the shipping checklist obligations (tests, regression, API docs, gates) named up front per the build-implementation-guardrails rule.
  • The plan is saved, the same way Phase 1's is. It governs every step of Phase 5, so it cannot live only in the conversation. The approved plan is written verbatim to <slug>-implementation-plan.md at Phase 5's first action and frozen thereafter — later deviation is recorded in the why-log or the session log, never by editing the approved plan.
  • Advance: plan approval (this is the handoff). The ledger row, the implementation-plan write, and the deferred Phase 4 notification all fire at Phase 5's first action.

Phase 5 — Implement (Working)

  • Reads: the approved plan; the test plan; repo-specific rules of the touched repo; ../../../docs/reviewers/pr-review-patterns.md for the self-review checklist.
  • Do:
    1. Save the approved plan verbatim as <slug>-implementation-plan.md (frozen once written — see Phase 4); update the ledger. 1b. Confirm the reviewer responded to the spec, before any product code. Record the response in the ledger with its form and date — a merged PR, a comment, an explicit go-ahead. Review latency is asynchronous and can outlast a session, so this is the one gate that legitimately parks a run: if the answer has not arrived, stop and say so rather than implementing on the assumption it will be fine. Proceeding anyway requires a waiver naming who authorised it and what risk it carries. A plan approval is not a spec approval — Phase 4 approves your sequencing, not the design someone else owns.
    2. Do not revise the test plan here. It was refined at Phase 3 against the locked decisions, and Phase 4's gate already traced every plan step to it — approving a plan confirms the touch points against the spec, it does not introduce anything the test plan has not already seen. What survives is the ordering rule: the refined test plan must be in place before any code is written, so the tests are never shaped by what was built. Status stays refined; there is no post-approval revision.
    3. Implement per the plan, inside the build-implementation-guardrails obligations (tests as part of shipping, architecture fit, graceful degradation by layer). 3b. Run the self-review checklist against your own diff — after the code, before the tests. ../../../docs/reviewers/pr-review-patterns.md carries the fixes reviewers ask for again and again, promoted to a checklist once a pattern recurs. Its whole purpose is catching them before a PR goes up rather than reactively after, and any refactor it prompts belongs here, while the tests have not yet been shaped around the current code.
    4. Execute testing/<slug>-test-plan.md: check off scenarios, fill the results log with exact command + scope + result (serial runs). A criterion that turns out to be unobservable in practice failed its own review — move that story to dnu/, write the next version, and log it; never reinterpret a criterion to match what was built.
    5. Maintain the testing-implementation doc testing/<slug>-testing-implementation.md per docs/testing-implementation-artifact.mdscenario-first: each real situation stress-tested (why it matters, whether it held), newly-uncovered scenarios flagged, and any code change hung off the scenario that forced it (file(s) + observed → expected → fix). This is the artifact that explains to other devs what was addressed — a test with no scenario is arbitrary execution. Write it as you go; living doc. PR-comment content, never a source comment (guardrails §7).
    6. If a PR draft shell was staged in Phase 2, fill it now (title, description, test evidence, commit hash) per ../../docs/pull-request-workflow.md — paste the testing-implementation doc's assembled block as the PR comment / test-evidence. Before every commit: changelog session log, then audit → lint → tests per the git-commit-workflow rule. PR per ../../docs/pull-request-workflow.md when requested.
  • Advance: notify (Progress notifications), then handoff → Phase 6 (Idle).

Phase 6 — Wrap up (Working)

The agent works in this phase. It was previously labelled Idle, which contradicted its own Do list — four artifacts get written here. Idle describes what happens after END, when you review manually and the agent is done.

  • Do:
    1. Finalize the Why doc: complete the reviewer-facing review in <slug>-why-these-changes.md — the categorized change breakdown (requested change / bug fix / workflow change / capability gap / other, with a headline count and Before / After / Why per change), "why it shipped together" tied to the acceptance criteria, Scope, Net, and Verified (gates + PR link). Confirm the why-log captured every phase where the why moved.
    2. Produce the review summary: what to review, where, walking each acceptance criterion against what shipped, citing the test plan's results log and the Why doc — no unfalsifiable "tests passed" claims.
    3. Cruft check: did this run surface outdated references, superseded docs, or dead weight? Append findings to ../../docs/cleanup-candidates.md; write "cruft check: nothing surfaced" in the ledger notes if clean.
    4. Close the ledger: Phase 6 done, Resume: complete; append each story's final Story log entry and confirm every index row reads accepted or superseded (see dnu/).
    5. Notify per Progress notifications — this is the final one, matching the standard agent-completion-notification rule usage.
  • Advance: END. The user reviews manually; you are done.

Edge cases

  • Personal projects (WorkLists, Countdowns, OtterCopy, …): <Project> = the docs/<project>/ folder name; changelog = that project's changelog per the ticket-changelog rule; the spec stays the sibling specs/<slug>-spec.md (wiki routing is PRDV-only). If docs/<Project>/ does not exist, ask once, then create it at Phase 0.
  • No ticket text at invocation: Phase 0 blocks on the verbatim request — ask the one question; never synthesize the request.
  • Deliberate skip: only on the user's explicit instruction. Record skipped (<user's reason>) in the ledger AND name the downstream inputs now missing (skipping Phase 1 leaves the spec uninvestigated; skipping Phase 3 leaves implementation without locked decisions). Never skip on your own initiative, never silently.
  • Artifact already exists: compare the ledger status and dates, then offer exactly three options — reuse as-is, refresh in place, or move to dnu/ and redo. original-ticket.md's Original Request section is never rewritten regardless of choice.
  • Conflicting instructions mid-flow: the user can always override a phase's course — record the override in the ledger notes; the orchestration continues from the adjusted state.

Do not

  • Do not assume you can switch modes; do not proceed past a handoff block.
  • Do not skip a phase, a gate, or an artifact silently — the ledger records everything, including waivers.
  • Do not scale artifacts down because the ticket seems small — invocation of this skill IS the request for full rigor.
  • Do not load later phases' docs early, and do not reload docs already embedded in a method you are executing.
  • Do not modify original-ticket.md after Phase 0 captures it — not the Original Request, not any other section. Files the run produces are recorded in the ledger's Artifacts column.
  • Do not edit <slug>-implementation-plan.md once it is saved — it records what was approved; deviation goes in the why-log or the session log.
  • Do not edit investigations/<slug>-recon-and-plan.md once it is saved — it records what was approved; deviation goes in the coverage ledger's reopen reason or the why-log, not into the plan.
  • Do not leave Phase 0 without at least one drafted job story — the acceptance-criteria baseline is set before the investigation, not derived from it.
  • Do not treat an investigation artifact as the authority on acceptance criteria; the job story owns what done means, and the spec cites it rather than amending it.
  • Do not reinterpret a criterion to match what was built — move the story to dnu/ and write the next version.
  • Do not let a story move without a Story log entry naming what changed.
  • Do not put the orchestration ledger anywhere except the ticket folder.
  • Do not emit anything after a handoff block.
  • Do not put any orchestration artifact outside C:\dustin-thomason\docs\<Project>\tickets\<slug>\, even when the implementation lives in a different repo or folder — see Repo boundary.
  • Do not touch implementation-repo files before Phase 0 and Phase 1 both show done in the ledger.
  • Do not mark a phase done — Phase 5 especially — on a claim or drafted code; the step's done condition must be met by an observed result.
  • Do not write product code before the spec's reviewer has responded, and do not treat Phase 4's plan approval as that response — it approves your sequencing, not a design someone else owns.
  • Do not call a spec "submitted" because the file exists; submitting means delivering it to the reviewer through the surface that team reviews on.
  • Do not rewrite a "done" investigation report to incorporate later findings; append a dated addendum section instead.
  • Do not assume a notification or script can run while genuinely in Plan mode; use the deferred-to-next-Working-action pattern in Progress notifications instead.
  • Do not skip the Problem Check pass or leave its framing claims ungrounded — cite the ticket's words; "nothing here" per flag is fine, silence is not.
  • Do not park a code-discoverable fact as an open-variable "for discussion," and do not bring it to the user to decide — trace it and resolve it via evidence (§8); only genuine decisions go to the user.
  • Do not run without a visible, checked-off todo list where the harness does not surface one.
  • Do not fill the PR draft body before Phase 5 — Phase 2 stages the shell only; content waits until the change is implemented and verified.
  • Do not put change rationale (observed → expected → fix) in a source comment; it is PR-comment content (guardrails §7).
  • Do not search for the ticket's WorkLists card; the id is supplied or created, never matched on text.
  • Do not tick a checklist row you cannot point at evidence for, and do not invent a value for a detail line.
  • Do not let a failed board write block the phase — that is a skip, recorded in the ledger.

Use it

Copy one of these into your project. Installing also returns the manifest and these snippets.

yaml
targets:
  - https://api.opensmartroute.ai/api/v1/registry/sirgunther-dustin-thomason-orchestrate/manifest   # or paste the manifest below

Manifest

An Open Capability Manifest: the router reads it to know what this does, what it costs and when to pick it.

sirgunther-dustin-thomason-orchestrate.ocm.jsonjson
{
  "ocm": "1",
  "id": "sirgunther-dustin-thomason-orchestrate",
  "kind": "skill",
  "name": "orchestrate",
  "description": "Conduct a ticket end-to-end through the seven-phase lifecycle — capture original ticket, investigate, report, probe and spec, prep for implementation, implement, manual review — with full-rigor artifacts, a generated per-phase checklist, and a standardized handoff at every mode boundary. Resumable from the per-ticket ledger. Use when the user says \"orchestrate\", \"orchestrate PRDV-XXXXX\", \"run the ticket workflow\", \"take this ticket through the phases\", or \"resume/continue orchestration\".",
  "publisher": "SirGunther",
  "version": "1.0.0",
  "capabilities": {
    "domains": [
      "customer_support",
      "hr"
    ],
    "tags": [
      "skill-md",
      "github"
    ],
    "languages": [
      "en"
    ]
  },
  "quality_prior": 0.6,
  "examples": [
    "Conduct a ticket end-to-end through the seven-phase lifecycle — capture original ticket, investigate, report, probe and spec, prep for implementation, implement, manual review — with full-rigor artifacts, a generated per-phase checklist, and a standardized handoff at every mode boundary. Resumable from the per-ticket ledger. Use when the user says \"orchestrate\", \"orchestrate PRDV-XXXXX\", \"run the ticket workflow\", \"take this ticket through the phases\", or \"resume/continue orchestration\"."
  ],
  "primary": false,
  "metadata": {
    "source": {
      "provider": "github",
      "repository": "https://github.com/SirGunther/dustin-thomason",
      "path": ".cursor/skills/orchestrate/SKILL.md",
      "ref": "3b480a8ad4fd907d8a9c0a58de5646c1181613fc",
      "url": "https://github.com/SirGunther/dustin-thomason/blob/3b480a8ad4fd907d8a9c0a58de5646c1181613fc/.cursor/skills/orchestrate/SKILL.md",
      "key": "SirGunther/dustin-thomason/.cursor/skills/orchestrate/SKILL.md"
    }
  },
  "instructions": "# Orchestrate — end-to-end ticket lifecycle\n\nDrive one ticket through all seven phases with maximum traceability, correctness, and completeness. This is the **full-rigor, opt-in** version of ticket work: invoking it means the user wants every artifact and every gate — do **not** scale the ceremony down because the ticket looks small. The user decides whether to invoke this; you do not decide to abbreviate it.\n\n**DO NOT PULL IN MODULES UNLESS ABSOLUTELY NECESSARY. WE WANT CONTEXT TO BE SIGNAL, NOT NOISE.**\nLoad only the current phase's listed inputs plus the orchestration ledger. Never preload ",
  "cost": {
    "context_tokens": 11134
  }
}

Fetch it by URL: GET /api/v1/registry/sirgunther-dustin-thomason-orchestrate/manifest?version=1.0.0