Prompt file imported from Peter-N91/csq-fabric-demo (
.github/prompts/dt-method-06-planning.prompt.md). Fill in{{project_slug}},{{selectedConcepts}}before use. Copyright stays with the author.
Method 6: Low-Fidelity Prototypes - Planning
Inputs
- {{project_slug}}: (Required) Kebab-case project identifier for the artifact directory (e.g.,
factory-floor-maintenance). - {{selectedConcepts}}: (Optional) Concepts from Method 5 to develop into lo-fi prototypes (default: top prioritized concepts).
Requirements
- All DT coaching artifacts are scoped to
.copilot-tracking/dt/{project-slug}/. Never write DT artifacts directly under.copilot-tracking/dt/without a project-slug directory.
Invoke Design Thinking coaching for Method 6a (Prototype Planning) to analyze concepts, identify core assumptions, design prototype approaches, and select testable formats.