Create Technical Plan
Use the actual current date from runtime context when dating plans and searching for recent documentation.
$fw:brainstorm defines WHAT to build. $fw:plan defines HOW to build
it. $fw:work executes the plan only after the user explicitly approves
that next step. A prior brainstorm is useful context but not required —
planning can start from a requirements doc, a bug report, a feature idea, or a
rough description.
When directly invoked, always plan. Never classify a direct invocation as "not a planning task" and exit the workflow. If the input is unclear, ask clarifying questions or use the planning bootstrap to establish enough context, but stay in planning.
This workflow produces a durable implementation plan. It is a read-only,
collaborative stage. It does not implement code, run tests, or silently
transition into execution-time work. After the plan file exists and the
confidence check completes, it must run document-review on that plan and end
with a user choice that explicitly offers $fw:deepen, review-finding
follow-up, a pause, or starting $fw:work.
When planning starts from a requirements, spec, or design document whose review state is unknown, offer source document review before drafting the plan. Use that review to catch simplification, feasibility, scope, and supportability issues that should be resolved by questions or brainstorming before planning continues.
Interaction Method
Follow ../references/host-interaction-contract.md.
Call the exact host question tool named in
../references/host-interaction-contract.md when that tool is available. Do
not ask for raw 1/2/3 replies when the host already offers a choice surface.
When the workflow spans multiple material steps, use the host task-tracking
tool named in ../references/host-interaction-contract.md to create and
maintain a short task list.
Ask one question at a time. Prefer concise single-select choices when natural options exist.
When multiple implementation or reliability postures are viable, present a short predicted choice list with the recommended label first and rely on the host's native freeform final path when it exists. When a planning question has a predictable answer space, prefer the same recommended-first portable option shape instead of a broad open-ended prompt.
Prefer to ask at least one targeted planning question when the answer would materially improve scope, sequencing, tradeoffs, or execution safety. Treat the user's answers and corrections as part of the planning record, not as throwaway chat.
Reference Loading Map
Do not load every reference file by default. Load only what the current phase needs:
- Read
references/universal-planning.mdonly when the task is clearly a non-software planning problem. - Read
references/visual-communication.mdonly when the plan structure would materially benefit from a dependency graph, interaction diagram, or comparison table. - Read
../references/research/research-brief-contract.mdwhen deciding whether a saveddocs/research/brief is fresh and in-scope enough to reuse. - Read
../references/research/activation-heuristics.mdwhen deciding whether to reuse a saved brief, skip external research, or run targeted follow-up research. - Read
../references/research/source-ranking-and-synthesis.mdwhen current external guidance, standards, or best practices materially affect the plan. - Read
../decision/SKILL.mdwhen planning reveals an unresolved durable decision, existing decision-record conflict, or terminology conflict that would change the plan. - Read
../decision/references/decision-record-format.mdonly when the plan must review or cite a durable decision-record shape. - Read
../decision/references/context-format.mdonly when planning must read or update project context, glossary, or bounded-context terminology. - Read
../references/architecture-code-quality/activation-heuristics.mdwhen deciding whether the work is architecture-bearing enough to need explicit boundary or pattern decisions. - Read
../references/architecture-code-quality/pattern-families.mdwhen the plan must compare named patterns or architectural styles. - Read
../references/architecture-code-quality/output-contract.mdwhen draftingArchitecture and Pattern Decisionsor equivalent specialist sections. - Read
references/unit-examples.mdonly when drafting implementation units, choosing test posture, or repairing output that is drifting from the required unit schema. - Read
references/issue-slice-export.mdonly when the user asks to create, export, or prepare issue-ready vertical slices from the plan. - Read
references/deepening-workflow.mdonly when Phase 5.3 determines the plan should be strengthened after the first draft is written. - Read
references/plan-handoff.mdonly after the plan file exists on disk and the confidence check is complete. - Read
../references/workflow-gates.mdafter the plan file exists and before presenting the final user choice. - Read
../observability/references/service-readiness-matrix.mdonly when the work changes runtime behavior, contracts, retries, queues, migrations, or other blast-radius-sensitive service boundaries.
Core Principles
- Use requirements as the source of truth — if
$fw:brainstormproduced a requirements document, planning should build from it rather than re-inventing behavior. - Decisions, not code — capture approach, boundaries, files, dependencies, risks, and test scenarios. Do not pre-write implementation code or shell choreography.
- Research before structuring — explore the codebase, prior learnings, and external guidance when warranted before finalizing the plan.
- Right-size the artifact — small work gets a compact plan. Large work gets more structure. The planning boundary stays the same.
- Separate planning from execution discovery — resolve planning-time questions here. Explicitly defer execution-time unknowns to implementation.
- Keep the plan portable — the plan should work as a durable document, review artifact, or issue body without embedding tool-specific executor instructions.
- Keep planning approval-gated — a plan should be understandable enough
for the user to review what will be worked on before
workbegins. - Plan vertical behavior slices by default — implementation units should each deliver one coherent user-facing, workflow-facing, API-facing, or contract-facing outcome through the necessary code, tests, docs, evals, and supporting artifacts. Horizontal units such as "write all tests," "edit all service files," "update all docs," or "refresh all generated artifacts" are allowed only for true prerequisites, mechanical sweeps, or final reconciliation, and must be marked as exceptions with a reason.
- Default behavior changes to TDD — feature work, bug fixes, public
contract changes, regression-prone paths, and behavior-preserving refactors
must plan a
tddposture unless an explicit exception applies. Usecharacterizationfor fragile existing behavior that must be pinned first, andno-new-testsonly for generated, configuration-only, documentation- only, trivial mechanical, or otherwise disproportionate units. State the exception and verification path whenever the unit is nottdd. - Plan the testing strategy, not just the code changes — every software
plan should state how new or changed behavior will be tested, which existing
test idioms to follow, whether to extend current tests or add new ones, and
which public contracts must stay protected. Exact test or coverage commands
belong to the host project's instructions or
$fw:work, not the plan. When TDD fits, each material hypothesis should map to a concrete red signal and a green completion signal. - Make runtime tradeoffs explicit — when a plan changes retries, fallbacks, queue behavior, health checks, or other operationally meaningful boundaries, present the current repo truth, likely failure modes, blast radius, viable options, and the recommended posture.
- Make architecture and pattern choices explicit when warranted — when
the work changes boundaries, ownership, named patterns, or distributed
posture, record the chosen option, rejected alternatives, and the clean-code
constraints
workmust preserve. - Prefer reusable research to redundant reruns — match fresh
docs/research/briefs first, then run only the narrow follow-up research needed to close planning gaps. Fold the decision-changing findings and recommendation into plan decisions instead of creating a side report by default. - Honor durable context and decisions — when the work is domain,
boundary, architecture, workflow-contract, or terminology bearing, search
existing context and decision records before finalizing the plan. Surface
contradictions as open decisions or route to
decision; do not silently overwrite settled project language or choices.
Plan Quality Bar
Every plan should contain:
- a clear problem frame and scope boundary
- concrete requirements traceability back to the request or origin document
- repo-relative file paths for the proposed work
- explicit test file paths for feature-bearing implementation units
- decisions with rationale, not just tasks
- relevant context and decision records, or an explicit note that none were found or needed
- existing patterns or code references to follow
- implementation units that are atomic enough to map cleanly to execution tasks and likely commit boundaries
- implementation units organized as vertical behavior slices by default, with any horizontal prerequisite, mechanical sweep, or reconciliation unit explicitly justified
- per implementation unit, an explicit test posture chosen from
tdd,characterization, orno-new-tests, with a brief reason - per implementation unit, an explicit execution mode chosen from
serialorparallel-ready, with a brief reason - an explicit testing strategy that defaults behavior-bearing work to TDD,
aligns with
AGENTS.md,CLAUDE.md, and local testing references when present, and assumes repo tooling exists even when command discovery is deferred - for
tddunits, 1-3 material hypotheses with explicit red and green proof points grounded in existing or new tests - clear public-contract coverage for any changed user-facing, API, CLI, schema, event, or integration behavior
- enumerated test scenarios for each feature-bearing unit
- clear dependencies and sequencing
- for architecture-bearing work, an explicit
Architecture and Pattern Decisionssection or equivalent that names current repo truth, candidate options, the chosen direction, rejected lighter/heavier options, and clean- code constraints for execution - for runtime-risky work, an explicit decision surface covering current behavior, top failure modes, blast radius, viable options, and the chosen recommendation
- for runtime-risky work, explicit coverage of the applicable service-readiness dimensions: contracts, state, failure modes, observability, rollout, recovery, and validation ownership
- enough detail that the next agent or human can start without rediscovering the project's testing posture or file-level patterns
A plan is ready when an implementer can start confidently without needing the
plan to write the code for them, and when the user can review what execution
would do before deciding whether to $fw:deepen the plan or start
$fw:work. The handoff should also make it easy for the user to see what
changed during planning, what remains open, what the review pass found, and
what execution would start with.
Feature Description
<feature_description> #$ARGUMENTS </feature_description>
If the feature description above is empty, ask the user: "What would you like to plan? Describe the task, goal, or project you have in mind."
If the input is present but unclear or underspecified, do not abandon the workflow. Ask one or two clarifying questions, or use the planning bootstrap to establish enough structure.
IMPORTANT: All file references in the plan document must use repo-relative
paths such as src/models/user.rb, never absolute paths.
Workflow
Phase 0: Resume, Source, and Scope
0.1 Resume Existing Plan Work When Appropriate
If the user references an existing plan file or there is an obvious recent
matching plan in docs/plans/:
- read it
- confirm whether to update it in place or create a new plan
- if updating, preserve completed checkboxes and revise only the still-relevant sections
Deepen intent: The word "deepen" in reference to a plan is the primary
trigger for the deepening fast path. When the user says "deepen the plan",
"deepen my plan", or "run a deepening pass", the target document is a plan in
docs/plans/, not a requirements document.
Words like "strengthen", "confidence", "gaps", and "rigor" are not enough on their own to trigger a holistic deepening pass. Prefer to confirm before entering the fast path unless the user clearly targeted the plan as a whole.
Once the plan is identified and appears complete:
- if the plan lacks YAML frontmatter, route to
references/universal-planning.mdfor editing or deepening instead of the software deepening flow - otherwise short-circuit to Phase 5.3 in interactive mode
Normal editing requests should not trigger the fast path.
0.1b Classify Task Domain
If the task involves building, modifying, or architecting software, continue.
If the task is a non-software multi-step goal worth planning, read
references/universal-planning.md and follow that workflow instead.
If the task is genuinely ambiguous, ask before routing.
For quick help, factual lookups, or single-step tasks, only skip the planning workflow when this skill was auto-selected rather than directly invoked.
0.2 Find Upstream Requirements Document
Before asking planning questions, search docs/brainstorms/ for files matching
*-requirements.md.
Treat a requirements document as relevant when:
- the topic semantically matches the feature description
- it appears to cover the same user problem or scope
- it is recent enough to still be trustworthy, unless the content is obviously still current or obviously stale
If multiple source documents match, ask which one to use.
0.3 Use the Source Document as Primary Input
If a relevant requirements document exists:
- read it thoroughly
- announce that it will serve as the origin document for planning
- carry forward:
- problem frame
- requirements and success criteria
- scope boundaries
- key decisions and rationale
- dependencies or assumptions
- outstanding questions, preserving whether they are blocking or deferred
- use it as the primary input to planning and research
- reference important carried-forward decisions in the plan with
(see origin: <source-path>) - do not silently omit source content
If no relevant requirements document exists, planning may proceed from the user's request directly.
0.4 Planning Bootstrap
If no relevant requirements document exists, or the input needs more structure:
- assess whether the request is already clear enough for direct technical planning
- if the ambiguity is mainly product framing, user behavior, or scope
definition, recommend
$fw:brainstormas a suggestion — but still offer to continue planning here - if the user wants to continue here, establish:
- problem frame
- intended behavior
- scope boundaries and obvious non-goals
- success criteria
- blocking questions or assumptions
Keep the bootstrap brief.
If major product questions remain unresolved:
- recommend
$fw:brainstormagain - if the user still wants to continue, require explicit assumptions before proceeding
If the request turns out to be a symptom without a known root cause, say so
clearly and do a brief investigation first rather than pretending planning can
start responsibly. If the issue is already understood and the fix is obvious,
suggest $fw:work as a faster alternative while still allowing planning.
0.5 Classify Outstanding Questions Before Planning
If the origin document contains Resolve Before Planning or similar blockers:
- review each one
- reclassify it into planning-owned work only if it is actually a technical, architectural, or research question
- keep it as a blocker if it would change product behavior, scope, or success criteria
If true product blockers remain:
- surface them clearly
- call the host question tool:
- Resume
$fw:brainstorm(Recommended) - resolve behavior, scope, or success criteria before planning - Continue with assumptions - convert each blocker into an explicit assumption or decision, then continue planning
- Resume
Do not continue planning while true blockers remain unresolved.
0.6 Offer Source Document Review Before Planning
If the primary input is a requirements, spec, or design document and it was not just reviewed in the current session, ask:
Review the source document before planning?
Call the host question tool with a portable 2-3 option menu:
- Review first (Recommended) - run
document-reviewon the source document to find simplification, feasibility, scope, and supportability issues before drafting the implementation plan - Continue planning - draft the plan from the current document and capture any uncertainty as explicit assumptions or deferred planning questions
- Return to brainstorm - resolve product or scope questions before planning; include this option only when the source document has material ambiguity
Skip the prompt only when the document was already reviewed in this session, the document contains clear recent review evidence, or the user explicitly asks to plan without another review.
If the user chooses review first, run document-review on the source document.
Use mode:headless in automated or pipeline contexts. After review:
- route product behavior, scope, success criteria, or definition-of-done findings
back to
$fw:brainstormor explicit user questions before planning - carry technical feasibility, sequencing, validation, rollout, and supportability findings into the plan as constraints or implementation units
- if residual
P0orP1findings remain, ask whether to resolve them first or continue with explicit assumptions before drafting the plan
0.7 Assess Plan Depth
Classify the work into one of these depths:
- Lightweight — small, well-bounded, low ambiguity
- Standard — normal feature or bounded refactor with some technical decisions to document
- Deep — cross-cutting, strategic, high-risk, or highly ambiguous work
If depth is unclear, ask one targeted question and then continue.
Phase 1: Gather Context
1.1 Local Research (Always Runs)
Build a concise planning context summary:
- if an origin document exists, summarize its problem frame, requirements, and key decisions
- otherwise use the feature description directly
Always do local research:
- inspect relevant parts of the codebase
- identify technology, architecture, patterns, and likely touched files
- read
AGENTS.mdandCLAUDE.mdguidance when present and when it materially affects the plan, especially testing methodology, workflow expectations, and project idioms - inspect nearby tests, helpers, fixtures, and naming patterns for the target area so the plan can say whether to extend existing coverage or create new tests
- read relevant entries from the active repo's
docs/solutions/or other durable learnings when they exist; search solution frontmatter byfiles_touched,module,tags,problem_type,component, and title before reading full docs. Preferdoc_status: activeand followsuperseded_bywhen present - when the active repo has
docs/research/, search that local store by frontmatter and title before broad external research; match ontopic,keywords,reuse_targets, and title. Prefer matching fresh briefs whosereuse_targetsincludeplan, and usefreshness_basisplusreuse_targetsto decide whether they still fit
When the platform supports delegated or parallel bounded research and policy allows it, you may split local research into small focused passes, for example:
- repo patterns and touched files
- prior learnings or solutions
- architecture and blast radius
If such delegation is unavailable, do the equivalent work directly.
Slack context is opt-in. If Slack tools exist and the user asked for them, gather organizational context. If tools exist but the user did not ask, note that Slack context is available on request.
When the work is runtime-risky, read
../observability/references/service-readiness-matrix.md and capture only the
dimensions that materially apply to this change. Do not force a full matrix
when the change is local and low-blast-radius.
1.1b Detect Execution Posture Signals
Decide whether the plan should carry a lightweight execution posture signal. Default to TDD for behavior-bearing units. Use another posture only when the change is generated, configuration-only, documentation-only, mechanical, styling/text-only with no unit-testable behavior, characterization-first, or not reasonably testable at planning time.
For each implementation unit, choose exactly one test posture:
tdd— use when the unit changes externally observable behavior, a public contract, a bug fix, a regression-prone code path, or a behavior-preserving refactor that is reasonably testable now. This posture requires explicit red and green proof points and tells$fw:workto load thetddskill before implementation.characterization— use when the first planning need is to lock current behavior in a fragile, legacy, or poorly understood area before changing it. State what behavior must be pinned and why a test-first failing proof point is not the right first move for that unit.no-new-tests— use only for configuration-only, mechanical, generated, documentation-adjacent, or otherwise disproportionate work. State why new tests are not warranted and how completion will still be verified.
Look for:
- repo instructions already prescribing TDD or another testing flow
- explicit TDD or test-first requests
- feature work, bug fixes, public contract changes, or refactors where a red-green-refactor loop will improve quality
- characterization-first needs in fragile or legacy areas
- configuration-only or infrastructure-only edits with little direct behavioral surface
- repo instructions or durable references that prescribe testing methodology or test layering
- repo context showing the target area is historically brittle or weakly tested
When the signal is clear, carry it forward explicitly in relevant
implementation units and summarize the overall posture mix in
## Testing Strategy. Ask the user only if the posture would materially change
sequencing or risk and cannot be responsibly inferred.
Do not turn this into exact command choreography. If test or coverage tooling is
not already documented in repo instructions, assume it exists and let
$fw:work discover the concrete command path during execution.
When TDD fits, frame the work as a red -> green -> refactor loop at plan level:
- identify the existing or new test that should fail first
- identify the passing condition that proves the unit is complete
- keep the plan at the level of proof points, not literal coding steps
- usually capture 1-3 material hypotheses per unit, not every trivial assertion
A material hypothesis is one externally observable behavior, contract change, or regression risk worth proving. Do not explode this into line-by-line assertions or every branch-level detail.
1.2 Decide on External Research
Before deciding to browse broadly, check whether a matching saved research brief already covers the topic. Treat a fresh matching brief as the default external-context input for planning. If the brief is stale or only partially answers the question, keep it as context and decide whether targeted follow-up research is needed rather than restarting the topic from zero.
Based on the origin document, user signals, local findings, and any saved research brief, decide whether external research or targeted follow-up research adds value.
Lean toward external research or targeted follow-up research when:
- the topic is high-risk: security, payments, privacy, external APIs, migrations, compliance
- the codebase lacks relevant local patterns
- local patterns exist only in adjacent domains, not the exact one being planned
- the user is exploring unfamiliar territory
- a saved brief exists but freshness or one open thread still needs a narrow update
Skip external research when:
- the codebase already shows strong direct local patterns
- the user already knows the intended shape
- additional external context would add little practical value
- a matching fresh brief already covers the current-practice questions
Announce the decision briefly before continuing.
1.3 External Research (Conditional)
If external research is useful, gather only the smallest set of sources that materially improve the plan or close the unresolved gap from a saved brief. Prefer official docs and primary sources for technical questions. Parallelize independent research threads only when policy and tools allow it.
1.4 Consolidate Research
Summarize:
- relevant codebase patterns and file paths
- relevant testing idioms, fixtures, helpers, and contract-test patterns
- relevant institutional learnings
- matching saved research briefs, their freshness basis, and any targeted follow-up that refreshed or narrowed them
- organizational context from Slack, if gathered
- external references and best practices, if gathered
- the recommendation-bearing takeaway those research inputs imply for the plan
- related issues, PRs, or prior art
- constraints that materially shape the plan
1.4b Reclassify Depth When Research Reveals External Contract Surfaces
If the current classification is Lightweight and research shows that the work touches external contract surfaces, reclassify to Standard.
Examples:
- environment variables consumed externally
- exported public APIs or CLI flags
- CI/CD configuration files
- shared interfaces consumed downstream
- documentation or workflows linked externally
1.5 Flow and Edge-Case Analysis (Conditional)
For Standard or Deep plans, or when flow completeness is still unclear:
- identify missing edge cases, state transitions, and handoff gaps
- tighten requirements trace and verification strategy
- add only the flow details that materially improve the plan
If the platform supports a specialist analysis pass and policy allows it, you may use one. Otherwise perform the analysis directly.
Phase 2: Resolve Planning Questions
Build a planning question list from:
- deferred questions in the origin document
- gaps discovered in repo or external research
- technical decisions required to produce a useful plan
For each question, decide whether it should be:
- resolved during planning — knowable from repo context, documentation, or user choice
- deferred to implementation — depends on code changes, runtime behavior, or execution-time discovery
Ask the user only when the answer materially affects architecture, scope, sequencing, or risk and cannot be responsibly inferred.
Do not run tests, build the app, or probe runtime behavior in this phase.
Phase 3: Structure the Plan
3.1 Title and File Naming
- draft a clear, searchable title such as
feat: Add user authentication - determine the plan type:
feat,fix, orrefactor - build the filename using:
docs/plans/YYYY-MM-DD-NNN-<type>-<descriptive-name>-plan.md - create
docs/plans/if it does not exist - determine the next sequence number for that date
- keep the descriptive name concise and kebab-cased
3.2 Stakeholder and Impact Awareness
For Standard or Deep plans, briefly consider who is affected — end
users, developers, operations, or other teams — and reflect that where useful
in System-Wide Impact.
3.3 Break Work into Implementation Units
Break the work into logical implementation units. Each unit should usually be a meaningful change an implementer could land as an atomic commit and track as one execution task.
Good units are:
- focused on one component, behavior, or integration seam
- usually touching a small related file cluster
- ordered by dependency
- small enough that execution can track them one-for-one in the host task tool
- independent enough that sibling units can be marked
parallel-readyonly when their write sets and reasoning truly do not collide - concrete enough for execution without pre-writing code
- checkable with
- [ ]syntax
Avoid:
- micro-steps
- units spanning unrelated concerns
- units that hide multiple independently completable changes behind one checkbox
- units that almost certainly require shared-write reconciliation but still pretend to be parallel-safe
- units so vague an implementer still has to invent the plan
3.4 High-Level Technical Design (Optional)
Before detailing units, decide whether an overview would help a reviewer validate the intended approach.
Use the medium that best fits the work:
| Work involves... | Best overview form |
|---|---|
| DSL or API surface design | Pseudo-code grammar or contract sketch |
| Multi-component integration | Mermaid sequence or component diagram |
| Data pipeline or transformation | Data flow sketch |
| State-heavy lifecycle | State diagram |
| Complex branching logic | Flowchart |
| Mode/flag combinations or multi-input behavior | Decision matrix |
| Single-component with non-obvious shape | Pseudo-code sketch |
Frame every sketch with:
This illustrates the intended approach and is directional guidance for review, not implementation specification.
Keep sketches concise.
3.4b Output Structure (Optional)
For greenfield plans that create a new directory structure, include an
## Output Structure section when the layout itself is a meaningful design
decision.
Skip it when:
- the plan only modifies existing files
- only 1-2 files are created in an existing directory
3.5 Define Each Implementation Unit
For each unit, include:
- Vertical slice — the behavior, workflow contract, API contract, or user
outcome delivered end to end by this unit; for a horizontal exception, name
it as
horizontal exceptionand explain why it cannot be a vertical slice - Goal
- Requirements
- Dependencies
- Execution mode — exactly one of
serialorparallel-ready, with a brief reason - Files — repo-relative file paths to create, modify, or test
- Test posture — exactly one of
tdd,characterization, orno-new-tests, with a brief reason - Approach
- Execution note — optional sequencing or rollout note; do not use this to restate the test posture
- Technical design — optional when the unit's approach is non-obvious
- Patterns to follow
- Test scenarios — specific cases right-sized to complexity and risk
- Red signal — for TDD-appropriate work, the failing test or assertion that should go red before implementation
- Green signal — for TDD-appropriate work, the passing condition that gives the worker ground truth that the unit is complete
- Verification — observable outcomes, not shell scripts
Feature-bearing units and other materially testable code changes should include
test file paths in **Files:**.
Use Execution mode deliberately:
serial— keep the unit ordered or inline even if the file list looks small, because it establishes shared decisions, touches cross-cutting seams, or is otherwise not a good parallel batch candidateparallel-ready— the unit is intentionally bounded so$fw:workmay consider it for concurrent execution after dependencies are satisfied and a fresh shared-write safety check passes
Default to serial unless the unit is genuinely independent enough that later
execution should not have to infer that posture from scattered hints.
For TDD-appropriate units, every meaningful hypothesis should be anchored to an existing or new test that can fail before the code change and pass after it. The goal is to give the worker a concrete truth source for completion, not just generic coverage intent.
Use the testing fields distinctly:
- Test scenarios — the behaviors or cases the unit must cover
- for
no-new-testsunits with no behavioral surface, usen/a -- [reason] - Red signal — the failing test or assertion that proves the work is not
done yet; required for
tdd, omitted or markedn/aotherwise - Green signal — the passing condition that proves the primary hypothesis is
satisfied; required for
tdd, omitted or markedn/aotherwise - Verification — only additional evidence beyond the main proof point; use
nonewhen the green signal is sufficient
Do not copy the same sentence into all four fields.
Use vertical slices as the default unit boundary:
- a slice should include the production changes, tests, docs, config, migrations, generated artifacts, and proof needed for that one behavior when those artifacts are in scope
- do not create one unit for all tests, another for all implementation, and a final unit for all docs, configs, migrations, or generated artifacts
- do not split by layer, file type, package, or artifact type unless the work is genuinely mechanical or preparatory
- when a prerequisite or reconciliation unit is unavoidable, mark it clearly as a horizontal exception and keep it serial unless repo truth proves it can run independently
For TDD units, the vertical slice should map to the first observable behavior
or tracer bullet that $fw:work can take red, green, and then refactor before
moving to the next slice.
If the output starts drifting from this schema, stop and read
references/unit-examples.md before continuing.
When a unit changes a public contract, call that out explicitly in the
**Approach:**, **Test scenarios:**, or both. Public contracts include
user-facing behavior, request/response shapes, exported APIs, CLI flags,
event payloads, schema-visible behavior, and integration boundaries consumed by
other systems.
Use Execution note sparingly.
Use Execution mode precisely. parallel-ready is permission for bounded
concurrent execution later, not a vague hope that parallelism might work out.
Do not turn units into verbose process theater. When TDD fits, capture the red and green proof points without spelling out full coding choreography.
3.6 Keep Planning-Time and Implementation-Time Unknowns Separate
If something matters but is not knowable yet, record it explicitly under deferred implementation notes rather than pretending to resolve it now.
Phase 4: Write the Plan
Use one planning philosophy across all depths. Change the amount of detail, not the boundary between planning and execution.
4.1 Plan Depth Guidance
Lightweight
- keep the plan compact
- usually 2-4 units
- omit optional sections that add little value
Standard
- use the full core template, omitting optional sections that add no value
- usually 3-6 units
- include risks, deferred questions, and system-wide impact when relevant
Deep
- use the full core template plus optional analysis sections where warranted
- usually 4-8 units
- group units into phases when that improves clarity
4.1b Optional Deep Plan Extensions
For sufficiently large, risky, or cross-cutting work, add only the sections that genuinely help:
- Alternative Approaches Considered
- Success Metrics
- Dependencies / Prerequisites
- Risk Analysis & Mitigation
- Phased Delivery
- Documentation Plan
- Operational / Rollout Notes
- Future Considerations only when they materially affect current design
4.2 Core Plan Template
Omit clearly inapplicable optional sections, especially for Lightweight plans.
---
title: [Plan Title]
type: [feat|fix|refactor]
status: active
date: YYYY-MM-DD
origin: docs/brainstorms/YYYY-MM-DD-<topic>-requirements.md # include when planning from a requirements doc
deepened: YYYY-MM-DD # optional, set when the confidence check substantively strengthens the plan
---
# [Plan Title]
## Overview
[What is changing and why]
## Problem Frame
[Summarize the user/business problem and context. Reference the origin doc when present.]
## Requirements Trace
- R1. [Requirement or success criterion this plan must satisfy]
- R2. [Requirement or success criterion this plan must satisfy]
## Scope Boundaries
- [Explicit non-goal or exclusion]
### Deferred to Separate Tasks
- [Work that will be done separately]: [Where or when]
## Context & Research
### Relevant Code and Patterns
- [Existing file, class, component, or pattern to follow]
### Institutional Learnings
- [Relevant active-repo `docs/solutions/` insight]
### Saved Research Briefs
- [Relevant `docs/research/` brief, freshness basis, and why it still applies]
### External References
- [Relevant external docs or best-practice source, if used]
## Key Technical Decisions
- [Decision]: [Rationale]
## Testing Strategy
- **Project testing idioms:** [What `AGENTS.md`, `CLAUDE.md`, local tests, or
durable refs say to follow]
- **Posture selection rule:** [Per unit choose exactly one of `tdd`,
`characterization`, or `no-new-tests`, and use repo context to justify it]
- **Plan-level posture mix:** [Briefly summarize which units are expected to use
`tdd`, `characterization`, and `no-new-tests`, and why that split fits this
plan]
- **Material hypotheses:** [For each `tdd` unit, identify 1-3 externally
observable behaviors, contract changes, or regression risks worth proving]
- **Red -> green proof points:** [For each TDD-appropriate unit, name the
existing or new failing test to start from and the passing condition that
proves the hypothesis]
- **Tooling assumption:** [Assume repo test and coverage tooling exists. Use
documented project instructions when present; otherwise let `$fw:work`
discover the concrete commands]
- **Public contracts to protect:** [User-facing flows, APIs, CLI flags, event
payloads, schema-visible behavior, integrations]
- **Primary test surfaces:** [Which suites, layers, or file clusters should
carry the coverage]
- **Test patterns to mirror:** [Existing tests, helpers, fixtures, factories,
or support utilities to extend]
## Dependencies And Parallelism
- **Critical path:** [Unit 1 -> Unit 3 -> Unit 4, or `straight-line`]
- **Parallel-ready sets:** [After Unit 1, Units 2 and 3 may run in parallel, or
`none`]
- **Serial-only units:** [Units that must stay ordered because they establish
shared seams, reconcile prior edits, or otherwise should not be batched]
## Open Questions
### Resolved During Planning
- [Question]: [Resolution]
### Deferred to Implementation
- [Question or unknown]: [Why it is intentionally deferred]
## Output Structure
[directory tree showing new directories and files]
## High-Level Technical Design
> *This illustrates the intended approach and is directional guidance for review, not implementation specification.*
[Pseudo-code grammar, Mermaid diagram, data flow sketch, or state diagram]
## Implementation Units
- [ ] **Unit 1: [Name]**
**Vertical slice:** [Behavior, workflow contract, API contract, or user outcome
delivered end to end; or `horizontal exception` with reason]
**Goal:** [What this unit accomplishes]
**Requirements:** [R1, R2]
**Dependencies:** [None / Unit 1 / external prerequisite]
**Execution mode:** [`serial` | `parallel-ready`] -- [one-sentence reason]
**Files:**
- Create: `path/to/new_file`
- Modify: `path/to/existing_file`
- Test: `path/to/test_file`
**Test posture:** [`tdd` | `characterization` | `no-new-tests`] -- [one-sentence reason]
**Approach:**
- [Key design or sequencing decision]
**Execution note:** [Optional sequencing or rollout note; do not repeat test posture]
**Technical design:** *(optional -- directional guidance, not implementation specification)*
**Patterns to follow:**
- [Existing file, class, or pattern]
**Test scenarios:**
- [Specific input/action -> expected outcome, or `n/a -- [reason]` for a true
`no-new-tests` unit]
**Red signal:** [Required for `tdd`: existing or new test/assertion expected to
fail before implementation. Otherwise `n/a -- [reason]`]
**Green signal:** [Required for `tdd`: that same test/assertion or contract
check passes when this unit is implemented correctly. Otherwise `n/a -- [reason]`]
**Verification:**
- [Additional evidence beyond the main proof point, or `none` when the green
signal is sufficient]
## System-Wide Impact
- **Interaction graph:** [What callbacks, middleware, observers, or entry points may be affected]
- **Error propagation:** [How failures should travel across layers]
- **State lifecycle risks:** [Partial-write, cache, duplicate, or cleanup concerns]
- **API surface parity:** [Other interfaces that may require the same change]
- **Integration coverage:** [Cross-layer scenarios unit tests alone will not prove]
- **Unchanged invariants:** [Existing behaviors this plan explicitly does not change]
## Risks & Dependencies
| Risk | Mitigation |
|------|------------|
| [Meaningful risk] | [How it is addressed or accepted] |
## Documentation / Operational Notes
- [Docs, rollout, monitoring, or support impacts when relevant]
## Sources & References
- **Origin document:** [docs/brainstorms/YYYY-MM-DD-<topic>-requirements.md](path)
- Saved research: [docs/research/YYYY-MM-DD-<topic>-research.md](path)
- Related code: [path or symbol]
- Related PRs/issues: #[number]
- External docs: [url]
4.3 Planning Rules
- all file paths must be repo-relative
- prefer path plus class, component, or pattern references over brittle line numbers
- keep units checkable with
- [ ] - shape units so
$fw:workcan map them directly onto host task items instead of inventing a second execution breakdown - do not include implementation code
- pseudo-code sketches and Mermaid diagrams are allowed when they communicate design direction
- do not include git commands, commit messages, or exact test command recipes
- do not pretend execution-time questions are settled just to make the plan look complete
4.4 Visual Communication in Plan Documents
When the plan contains:
- 4+ implementation units with non-linear dependencies
- 3+ interacting surfaces in
System-Wide Impact - 3+ behavioral modes or variants in
OvervieworProblem Frame - 3+ interacting decisions or alternatives
read references/visual-communication.md.
Phase 5: Final Review, Write File, and Handoff
5.1 Review Before Writing
Before finalizing, check:
- the plan does not invent product behavior that should have been defined in
$fw:brainstorm - if there was no origin document, the planning bootstrap established enough product clarity to plan responsibly
- every major decision is grounded in the origin document or research
- when a saved research brief or follow-up research shaped the plan, freshness, source scope, and reuse boundaries stay explicit, and repo truth remains distinct from external guidance
- the testing strategy reflects
AGENTS.md,CLAUDE.md, local test patterns, and any durable testing references when present - the testing strategy defines per-unit posture choices using exactly
tdd,characterization, orno-new-tests - the testing strategy defaults behavior-bearing units to TDD, and records explicit exceptions where that is not the right posture
tddunits define 1-3 material hypotheses rather than a vague or bloated proof-point list- TDD-appropriate units provide clear red and green proof points so the worker has a concrete completion signal
- implementation units are atomic enough to map cleanly to host-tracked execution tasks and likely commit boundaries
- each unit's
Execution modeis explicit, justified, and consistent with its dependencies and likely file overlap - the first serial unit or first eligible parallel-ready batch is obvious from the plan when mixed execution modes exist
Test scenarios,Red signal,Green signal, andVerificationare distinct rather than duplicated- each implementation unit is concrete, dependency-ordered, and ready for execution
- changed public contracts are matched to explicit coverage expectations
- test scenarios are specific and complete enough for the unit's risk profile
- the plan contains enough detail for the next implementer to start without re-deriving the project's testing approach
- the plan does not hardcode exact test or coverage command recipes that belong
in repo instructions or
$fw:work - deferred items are explicit and not hidden as fake certainty
- any high-level technical design is directional rather than copy-paste-ready
- if the plan originated from a requirements document, every meaningful section of the origin document is addressed
5.2 Write Plan File
REQUIRED: Write the plan file to disk before presenting any options.
Save the complete plan to:
docs/plans/YYYY-MM-DD-NNN-<type>-<descriptive-name>-plan.md
Confirm:
Plan written to docs/plans/[filename]
In automated or pipeline contexts, skip interactive questions and make the needed choices automatically.
5.3 Confidence Check and Deepening
After writing the plan file, automatically evaluate whether the plan needs strengthening.
Two deepening modes exist:
- Auto mode — default during plan generation. Findings are synthesized directly into the plan without per-finding approval.
- Interactive mode — used when the user explicitly asked to deepen an existing plan. Findings are presented before integration.
The confidence check and document-review are different:
document-reviewchecks coherence, feasibility, scope alignment, simplification pressure, observability/supportability gaps, and role-specific document quality- the confidence check strengthens rationale, sequencing, risk treatment, and system-wide thinking when the plan is structurally sound but still thin
Determine:
- plan depth
- topic risk profile
- whether local grounding is thin enough that a strengthening pass is warranted
If the plan already appears sufficiently grounded, report:
Confidence check passed — no sections need strengthening.
and skip to document review.
When deepening is warranted, read references/deepening-workflow.md and execute
that flow.
5.4 Document Review, Final Checks, and Post-Generation Options
After the confidence check, read references/plan-handoff.md and
../references/workflow-gates.md. Document review is mandatory — do not skip
it even if the confidence check already ran.
Apply the Plan-Ready gate before offering work. Close with the canonical
handoff card: Stage, Artifact, Ready, Open decisions, Evidence, and Next. The
Ready field is conditional until the user chooses whether to address review
findings, deepen the plan, or start $fw:work.
NEVER CODE. Research, decide, and write the plan.