Delivery and completion rules
- When a plan is finalized, commit and push it to
origin/mainautomatically. Do not wait for approval to perform the routine plan commit or push. - Treat a pushed plan as a record of intended work only. It never means the related feature, task, or implementation is complete.
- Do not archive or mark a task complete just because its plan is committed or pushed. Before archiving, verify that every scoped implementation item is complete, the implementation commits are pushed to
origin/main, and the required validation has passed. - If any planned work is deferred, incomplete, or unverified, keep the task active and state that it is partially complete.
- Continue routine implementation, commits, and pushes without requesting confirmation; surface only genuine blockers, failed verification, or choices that materially change scope.
Odoo 2s Improvement completion tracking
- This workflow applies when a user-requested task corresponds to an existing row in Odoo's 2s Improvement Reference Data table.
- A plan is intended work only. Do not mark an improvement
Completeduntil every scoped implementation item is complete, required validation passes, and the implementation commits are pushed toorigin/main. - Locate exactly one matching existing improvement. Prefer an Odoo ID or Plant Manager Source ID supplied with the task; otherwise require one clear title-and-description match. Never create a row or guess between matches.
- If Source is
GPI Plant Manager, use the authoritative local feedback lifecycle.GPI-PM-FB-<positive id>or its positive Feedback ID is authoritative; never use a Task ID. - As soon as work begins, including planning, preview the exact local start with
python -m scripts.process_feedback --source-id GPI-PM-FB-<id>, then apply it with the same command plus--yes. A positive Feedback ID may be supplied with--feedback-id <id>instead. - After implementation is complete, validation passes, and the implementation commits are pushed to
origin/main, preview the exact local finish withpython -m scripts.resolve_feedback --source-id GPI-PM-FB-<id> --note "<plain-language result>" --by "<authenticated actor email>", then apply it with the same command plus--yes.--bydefaults todale@gruberpallets.comwhen that is the real closer. - The start and finish commands are dry-run by default and require
--yesto change local feedback. Never edit the Odoo mirror directly. Let the normal worker synchronize the existing mirror, then read the same Odoo row back and verify its status before claiming completion. - Plant Manager feedback completion includes its durably associated Odoo owner task. After the normal workers run, obtain the task only from the local
feedback_task_deliveryrelationship, read that exact task back, and verify both records: Completed feedback requires Improvement StatusCompleted, task stageDone, and task StatusDone; declined feedback requires Improvement StatusDeclined, task stageDone, and task StatusCancelled. Never trust local sync-version equality without the final Odoo task readback, and never use a pasted Task ID as the relationship authority. - For an existing row not owned by Plant Manager, use the authenticated Odoo completion workflow to set Status to
Completed. Fill only completion fields required by that workflow, using the current date, authenticated actor, and a short plain-language result. Do not change unrelated fields. - Read the same Odoo row back and verify Status is
Completed. State the verified Odoo result in the final handoff. - If there is no single match, access or the lifecycle row is unavailable, the lifecycle row is ambiguous or terminal, the owner-task relationship is missing or ambiguous, a write or synchronization fails, or either required readback is not in its expected terminal state, leave the lifecycle unchanged where possible, keep the task active or partially complete, and report the blocker to Dale without exposing sensitive details.
- Never create, delete, archive, merge, or otherwise rewrite Odoo improvement rows as part of completion tracking.
What's New patch notes
- For every push to
main, write any newCHANGELOG.md/ What's New patch notes so a 10-year-old can understand them. - Use short sentences and common words. Say what changed and how it helps the person using the app. Leave out developer-only details, code names, routes, and implementation steps. If an unfamiliar word is needed, explain it right away.
- Keep historical patch notes unchanged; apply this rule only to new entries.
Coding request repository safety
This repository's canonical identity is gpi-plant-manager.
When a pasted coding request contains TARGET REPOSITORY, compare it with this
repository before editing files or running mutating commands. If it is not
gpi-plant-manager, stop and tell Dale which repository the request requires.
Never use the task's Odoo Project to override TARGET REPOSITORY.
Claude Handoff — Recycled Smart Rotations
Start here
Read these two approved documents before changing code:
docs/superpowers/specs/2026-07-10-recycled-rotations-design.mddocs/superpowers/plans/2026-07-10-recycled-smart-rotations.md
The work is intentionally being done directly on main.
Current status
All implementation-plan tasks (1–7) are complete, committed, reviewed, and deployed. Pushed to origin/main on 2026-07-11 (commit 44a7a10); Railway auto-deployed and the web service is Online (healthz 200). Full test suite: 1,616 passed / 301 skipped.
Each task passed a spec-compliance review and a code-quality review before the next began. Feature commits, newest first:
44a7a10 docs: explain recycled rotations(Task 7 — regression + README)b94678a feat: manage recycled rotation preferences(Task 6 — People Matrix editor + block lifecycle)aab7af1 feat: add recycled staffing controls(Task 5 — staffing mode control + reasons/warnings)b93a99a fix: bound rotation absence window and tighten staffing wiring(Task 4 review fixes)b3063dd feat: schedule recycled rotations(Task 4 — rotation APIs + staffing wiring)8d7262a fix: make reconcile the sole owner of training-block completion(Task 3 review fix)a636218 test: patch shared odoo_client for skill-cell writer tests(Task 3)04c81fd feat: add recycled training blocks(Task 3 — training lifecycle + shared promotion)b3594a3 fix: harden recycled rotation review findings(Task 2 review fixes)1291238 feat: add recycled rotation recommendations(Task 2 — pure scoring engine)- Task 1 (persistence):
97cfe8c,e45a4fd,5ca596e,f1ef5e7
The approved design and plan are committed as 8096a7e (design) and 0e2c3d2 (plan).
Remaining follow-ups (post-deploy)
- Live smoke test the two UI surfaces — the staffing "Recycled schedule goal" control and the People Matrix rotation editor / training-block form. All routes are Azure-AD-gated, so these were verified by template-render + logic checks, never in a real browser.
- Confirm the blank-day behavior reads right: a fresh Recycled day is now seeded by the rotation engine (not the static
default_people), with manual locks and Trim Saw pairing preserved.
Key invariants (for future changes)
rotation_training.reconcile_blocksis the SOLE owner of training-block completion + the level-0→1 promotion.rotation_store.record_attended_dayis a pure recorder that must NOT auto-complete (auto-completing would let a block finish without ever promoting, sinceactive_blocks()only returnsstatus='active').- Manual assignment locks (
assignment_sources[wc][name] == "manual") survive rebuilds; seated people of every source stay put; only unassigned people receive new Auto placements; non-Recycled centers are never touched. _absence_by_day_for_blockis capped atplanned_block_days' scan horizon to avoid O(days) DB fan-out on the hot staffing page.
Global Auto scheduling
- A goal-button rebuild keeps every currently seated person and only assigns unassigned available people into remaining Auto-on maximum capacity. Full-day absences are not available for new Auto seats.
- Leftover people with no safe opening stay unassigned. That fill is saved. Hard failures remain malformed requests, missing Auto configuration, zero Auto-on centers, or an unsafe new seat.
- Automatic assignments may use only work centers whose Auto checkbox is enabled; the solver never enables or populates another center on its own.
- Exact/group defaults never pull a seated person to another center. For leftovers, a default is used when that center still has room; otherwise Auto may use another safe open Auto center.
- Each person may have at most one default target across exact work-center defaults and user-managed group defaults.
- Saving Settings → Work Centers REPLACES both default tables from the posted form (
work_centers_store.replace_default_targets), and the page autosaves the whole form on any edit. So every already-saved default must render as a checked checkbox —settings_context.work_center_rows/with_group_default_contextkeep selected people in the picker pool (flaggedpreserved) even when they've gone inactive, reserve, unqualified, or off-roster. Narrowing either pool without preserving selections silently deletes configuration (fixed 2026-08-04,eb77f83). - Exact defaults are hard work-center constraints. Group defaults are hard user-group constraints and rotate evenly only among qualified, enabled member centers.
- Manual locks and exact/group defaults are hard constraints. A
neverpreference may be overridden only when it is the only safe leftover seat. - "The defaults" (decided by Dale 2026-07-23; supersedes the 2026-07-21 "complete rebuild" definition) = a clear-and-load-defaults placement (
staffing_route.defaults_only_schedule): discard every assignment, then seat ONLY the people configured as a work-center or group default (_defaults_only_assignments, sourcesdefault). Non-default people are left unscheduled. This is deliberately NOT the full auto rebuild — the goal buttons run that on demand. A brand-new future day is seeded with it on first view (modenormal, the default Auto centers) and persisted; Reset to defaults produces the same state. Reset never 422s and never runs the solver — defaults always place, so it always succeeds (empty defaults → empty day). The seed persists only on a successful defaults read (strict=Trueraises otherwise, leaving no row so the next view retries). - The non-reset goal button is the only path that runs the rotation engine (
minimum_only=False, fills remaining maximum seats around the current board). Seed and reset stay in lockstep — both producedefaults_only_schedule's output. - Level 0 is automatic only through a validated training block; otherwise that leftover person stays unassigned and the fill is saved.
- Page context, Auto selection advisories, and rebuild failures must serialize the same structured placement issues.
- Focused checks:
ZIRA_API_KEY=test .venv/bin/python -m pytest tests/test_schedule_solver.py tests/test_schedule_solver_properties.py tests/test_rotation_suggestions.py tests/test_staffing_rotations.py -q.
Binding product decisions
- Scope automatic rotation to the Recycled groups
Dismantler,Repair, andTrim Saw. - Per-person/group soft preferences are exactly
primary,regular,occasional, andnever; missing meansregular. - Daily modes are exactly
optimized,normal(default), andtraining. - Rotate people within their group across individual centers fairly. For example, Repair 1 → Repair 2 → Repair 3 rather than repeatedly choosing Repair 1.
- Optimized maximizes level-3 coverage; Normal balances coverage, preference, and history; Training develops a capped number of level-1/2 operators while preserving level-3 pairing.
- Level 0 is only eligible through a training block: day one pairs the trainee with a chosen level-3 trainer; later attended workdays reserve only the trainee; full-day absences extend the block; completion promotes the target skill to level 1.
- Manual assignment locks must survive rebuilds. Generated assignment sources are exactly
generatedormanual. - Preserve existing Trim Saw pairing guarantees, next-day default seeding, and safe fallbacks.
What Task 1 added
- Additive schema for rotation preferences, training blocks, completed/absent block days, schedule mode, and assignment sources.
src/zira_dashboard/rotation_store.pyfor preference/block persistence and validation.Schedule.rotation_modeandSchedule.assignment_sources, including hydration, snapshots, save/load, posted view isolation, and all known pass-through save paths.- Validation that training blocks are only for the three Recycled groups and assignment sources have the exact
generated/manualvocabulary.
Task 1 review coverage included metadata preservation through notes-only saves, regular saves, discard-draft, clear-testing-day, object API saves, posted-to-draft cache usage, and next-day smart-default seeding.
Test baseline and environment note
Before implementation, the suite was clean except that the Playwright browser test could not launch inside the restricted sandbox. The focused browser test passed once Chromium was allowed to run outside the sandbox. Baseline result is therefore 1,499 passed, 300 skipped with normal local browser permissions.
Use:
ZIRA_API_KEY=test .venv/bin/python -m pytest -q
The following database-backed tests are expected to skip when DATABASE_URL is not configured:
tests/test_staffing_schedules_bulk.py
tests/test_staffing_custom_hours.py
Workspace notes
- The pre-existing untracked
.claude/directory is not part of this work. Do not add, remove, or modify it. .superpowers/is gitignored scratch state. It contains Codex task briefs/reports and is not required to continue; the committed plan is authoritative.- Current branch:
main.
Recommended continuation
- Run the Task 2 red tests from the implementation plan.
- Implement only the pure recommendation engine changes in
rotation_suggestions.pyand its tests. - Keep the existing Trim Saw public functions/regressions intact.
- Review Task 2 before starting Task 3.