About

Imported from borghei/claude-skills (ra-qm-team/audit-prep/fda-qsr-audit-prep/SKILL.md). Install upstream with npx skills add borghei/claude-skills --skill fda-qsr-audit-prep. Copyright stays with the author (MIT + Commons Clause).

FDA QSR / QMSR Audit Prep

Operational playbook for FDA inspection preparation under Quality System Regulation (21 CFR 820) and the transitioning Quality Management System Regulation (QMSR, fully effective 2026, harmonizing with ISO 13485:2016).

When to use this skill vs. fda-consultant-specialist:

  • This skill: FDA inspection imminent OR 483/Warning Letter received; need sprint
  • fda-consultant-specialist: building / maintaining QMS; multi-quarter

When to use this skill

Situation Skill applies
FDA inspection announced (or unannounced visit imminent) Yes — start immediately
Form 483 observation received Yes — scripts/qsr_readiness_score.py to assess + plan response
Warning Letter received Yes — plus engage outside FDA counsel
Annual readiness assessment Yes — periodic sprint
Building QMS from scratch Use ra-qm-team/fda-consultant-specialist
Medical device submission (510k / PMA) Use ra-qm-team/fda-consultant-specialist

The audit-prep sprint at a glance

2-week sprint (announced inspection, mature QMS)

Week 1: Inventory, walkthrough rehearsal, gap remediation
Week 2: Inspection week (front room + back room operation)

8-week sprint (gaps identified, scheduled inspection)

Weeks 1-2: Readiness assessment + 483 / WL prior issue review
Weeks 3-6: Gap remediation (DHF, CAPA, complaint records, etc.)
Weeks 7-8: Mock inspection + final remediation + inspection prep

Reactive: 483 / Warning Letter response

- 483: 15 business days to respond (then ongoing)
- Warning Letter: 15 business days to respond (then full corrective action plan)
- Approach: Acknowledge + investigate root cause + corrective action plan + commitment + evidence

QSR / QMSR key audit areas

21 CFR 820 Subpart Topic Audit focus
Subpart B Quality system Management responsibility, quality policy, planning
Subpart C Design controls Design history file (DHF), design reviews, V&V
Subpart D Document controls Document approval, change control, distribution
Subpart E Purchasing controls Supplier qualification, agreements, evaluations
Subpart F Identification and traceability Product ID, lot/batch traceability
Subpart G Production and process controls Process validation, environmental controls, equipment maintenance
Subpart H Acceptance activities Receiving, in-process, finished device acceptance
Subpart I Nonconforming product Identification, segregation, disposition
Subpart J Corrective and preventive action (CAPA) CAPA process, root cause analysis, effectiveness verification
Subpart K Labeling and packaging Label inspection, packaging validation
Subpart L Handling, storage, distribution Procedures, shelf-life, distribution records
Subpart M Records Device Master Record (DMR), Device History Record (DHR), QSR records
Subpart N Servicing Servicing procedures, complaint review
Subpart O Statistical techniques Sampling, statistical methods

QMSR transition (effective Feb 2026): Harmonizes 21 CFR 820 with ISO 13485:2016. Adds requirements for risk management (ISO 14971), software lifecycle (IEC 62304), usability (IEC 62366).


Clarify First

Before running the audit-prep, confirm these inputs. If any is unknown or vague, ASK — do not assume:

  • Trigger — announced inspection, Form 483 received, Warning Letter, or annual readiness (chooses between the sprint track and the reactive 15-day response track, and sets deadlines)
  • Framework — legacy QSR (21 CFR 820) vs QMSR (ISO 13485-harmonized, effective Feb 2026) (changes which requirements and subparts apply)
  • QMS maturity and known issues — mature vs gaps, plus prior 483/WL findings (picks the 2-week vs 8-week sprint)

Stop rule: ask only the 2-3 that most change the output. If the user says "just draft it," proceed and list your assumptions at the top of the readiness assessment.

Quick start

  1. Run readiness score: python3 scripts/qsr_readiness_score.py --config qsr-controls.yaml
  2. Check DHF completeness for in-scope devices: python3 scripts/dhf_completeness_checker.py --dhf device-dhf.yaml
  3. Pick sprint length based on score + known issues
  4. Execute sprint per references/fda-qsr-pre-inspection-checklist.md

Common FDA inspection findings (highest 483 / Warning Letter trigger)

  1. CAPA failures — root cause not addressed, ineffective corrective action
  2. Complaint handling — complaints not investigated, MDR (Medical Device Reporting) missed
  3. Design controls (Subpart C) — DHF incomplete, V&V gaps, no design reviews
  4. Process validation — processes not validated, validation stale
  5. Supplier controls — suppliers not qualified, agreements missing, evaluations skipped
  6. Document control — old procedures in use, no document approval evidence
  7. Management responsibility — no management review, no quality policy, no objectives
  8. Records (DHR) — incomplete records, missing lot traceability

See references/483-warning-letter-prevention.md for prevention patterns + response templates.


Inspection-week operations

Front room (where inspector works)

  • Designated front room (conference room, not someone's office)
  • Front-room lead (often Quality Manager) accompanies inspector all day
  • All requests routed through front-room lead
  • Inspector requests evidence; front-room asks back-room

Back room (where requests are fulfilled)

  • Cross-functional team available
  • Document retrieval, witness preparation, technical questions answered
  • Inspector requests evidence; back-room delivers (filtered through front-room lead)

Daily debrief

  • End of each inspection day: review what was inspected, observations, next-day topics
  • Prepare overnight any evidence needed for next day

After inspection

  • Form 483 review (if issued): consult with QA Lead + outside counsel
  • 15 business days to respond
  • Full corrective action plan
  • Ongoing engagement with FDA office

Tooling

Script Purpose
scripts/qsr_readiness_score.py Score current QSR/QMSR state per subpart
scripts/dhf_completeness_checker.py Validate Design History File completeness per device

References


Related skills

  • ra-qm-team/fda-consultant-specialist — deep FDA program (510k, PMA, QMSR build)
  • ra-qm-team/quality-manager-qms-iso13485 — ISO 13485 QMS (QMSR harmonized)
  • ra-qm-team/risk-management-specialist — ISO 14971 (required for QMSR)
  • ra-qm-team/capa-officer — CAPA process specialist
  • ra-qm-team/qms-audit-expert — internal/external QMS audits
  • ra-qm-team/audit-prep/compliance-readiness — multi-framework readiness

Use it

Copy one of these into your project. Installing also returns the manifest and these snippets.

yaml
targets:
  - https://api.opensmartroute.ai/api/v1/registry/borghei-claude-skills-fda-qsr-audit-prep/manifest   # or paste the manifest below

Manifest

An Open Capability Manifest: the router reads it to know what this does, what it costs and when to pick it.

borghei-claude-skills-fda-qsr-audit-prep.ocm.jsonjson
{
  "ocm": "1",
  "id": "borghei-claude-skills-fda-qsr-audit-prep",
  "kind": "skill",
  "name": "fda-qsr-audit-prep",
  "description": "FDA Quality System Regulation (21 CFR 820 / QMSR) audit-prep playbook for medical devices. Use when an FDA inspection is announced, when preparing for the new QMSR (2026), or when a 483 / Warning Letter response is needed.",
  "publisher": "borghei",
  "version": "1.0.0",
  "capabilities": {
    "domains": [
      "legal",
      "math"
    ],
    "tags": [
      "skill-md",
      "fda",
      "qsr",
      "qmsr",
      "21-cfr-820",
      "medical-devices",
      "audit-prep",
      "483-response",
      "warning-letter",
      "skills-sh"
    ],
    "languages": [
      "en"
    ]
  },
  "quality_prior": 0.6,
  "examples": [
    "FDA Quality System Regulation (21 CFR 820 / QMSR) audit-prep playbook for medical devices. Use when an FDA inspection is announced, when preparing for the new QMSR (2026), or when a 483 / Warning Letter response is needed."
  ],
  "primary": false,
  "metadata": {
    "source": {
      "provider": "skills.sh",
      "repository": "https://github.com/borghei/claude-skills",
      "path": "ra-qm-team/audit-prep/fda-qsr-audit-prep/SKILL.md",
      "ref": "HEAD",
      "url": "https://github.com/borghei/claude-skills/blob/HEAD/ra-qm-team/audit-prep/fda-qsr-audit-prep/SKILL.md",
      "key": "borghei/claude-skills/ra-qm-team/audit-prep/fda-qsr-audit-prep/SKILL.md"
    },
    "license": "MIT + Commons Clause"
  },
  "instructions": "# FDA QSR / QMSR Audit Prep\n\nOperational playbook for FDA inspection preparation under Quality System Regulation (21 CFR 820) and the transitioning Quality Management System Regulation (QMSR, fully effective 2026, harmonizing with ISO 13485:2016).\n\nWhen to use this skill vs. fda-consultant-specialist:\n- **This skill**: FDA inspection imminent OR 483/Warning Letter received; need sprint\n- **fda-consultant-specialist**: building / maintaining QMS; multi-quarter\n\n---\n\n## When to use this skill\n\n| Situation | Skill applies |\n|-----------|---------------|\n| FDA inspection announced (or unannounced ",
  "cost": {
    "context_tokens": 1817
  }
}

Fetch it by URL: GET /api/v1/registry/borghei-claude-skills-fda-qsr-audit-prep/manifest?version=1.0.0

Reviews

Star ratings from people who tried it. One review per account; edit yours any time.

No reviews yet. Install it, try it, and be the first to rate it.